Planning application · KENSINGTON-CHELSEA/OB/25/06315
Application for variation to reconfigure Phase 5 from townhouses to 87 apartments across three blocks, with increased massing and height.
Development Site At Chelsea Barracks, Chelsea Bridge Road, London
- New-Build & Major Development
- Large 7/10
- Basement Omission
- Demolition
- Mixed Use
- Planning Condition Variation
- Residential Flats
Overview
Why it’s worth watching
A major Chelsea Barracks phase would be reconfigured from 20 townhouses to 87 apartments with increased massing and height, a material change at a significant development site.
- Stage
- Past its target date of 22 Dec 2025.
As lodged with the council
This Council is asked for its observations on an application received by Westminster for theVariation of conditions 1, 2, 3, 53, 54, 55 and 58 of planning permission dated 16 November 2018 (RN 18/04103/OUT) as amended by decisions dated 23 January and 20 October 2025 (RNs 24/08839/NMA and 25/07210/NMA) for: "Variation of Conditions 1, 6, 9, 26, 46, 53, 54 and 55 of outline permission dated 12 March 2018 (RN: 17/07176/OUT) for the demolition of existing former barracks buildings and warehouse (Dove Walk) in connection with the redevelopment of the site for mixed use purposes comprising residential (Class C3), sports centre (Class D2), retail (flexible use within Class A1/A2/A3), health centre (Class D1), non-residential institution/leisure uses (flexible use within Classes D1 and/or D2); hard and soft landscaping and open space; reconfigured and new vehicular and pedestrian accesses and works to the public highway; together with all associated works including the construction of basement to provide ancillary vehicular and cycle parking, circulation, servicing and plant areas and alterations to perimeter railings.", Namely, thereconfiguration of Phase 5 from the consented 20 townhouses to 87 apartments (Class C3) across three blocks (Buildings 12, 13 and 14) and the associated increase in building footprint, massing and height and the omission of one basement level
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application KENSINGTON-CHELSEA/OB/25/06315?
Follow it on City Scope. This page is checked against the Kensington & Chelsea planning register and shows the latest status, decision and documents for KENSINGTON-CHELSEA/OB/25/06315. To comment on the application, use the Kensington & Chelsea planning portal.
The impact
What it involves.
Tags
- Residential Flats
- Demolition
- Basement Omission
- Mixed Use
- Planning Condition Variation
- Townhouse
What each tag is based on
- Basement Omission
- “omission of one basement level”
- Demolition
- “demolition of existing former barracks buildings and warehouse”, “demolition”
- Mixed Use
- “redevelopment of the site for mixed use purposes”
- Planning Condition Variation
- “Variation of conditions 1, 2, 3, 53, 54, 55 and 58”
- Residential Flats
- “reconfiguration of Phase 5 from the consented 20 townhouses to 87 apartments”
- Townhouse
- “reconfiguration of Phase 5 from the consented 20 townhouses”
Where it’s at
Comments have closed. The target date for a decision has passed.
- Validated27 Oct 2025The council has everything it needs.
- Comments closed17 Nov 2025Usual deadline. Late comments may still count.
- Target decision22 Dec 20258-week target for minor and other applications.
- Decision18 Jun 2026Decided.
Planning terms
- Use class C3
- Dwellinghouses: homes lived in by one household or a small group.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- KENSINGTON-CHELSEA/OB/25/06315
- Address
- Development Site At Chelsea Barracks, Chelsea Bridge Road, London
- Category
- New-Build & Major Development
- Impact scale
- 7/10
- Authority
- Kensington & Chelsea
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
