Planning application · LAMBETH/26/00622/OBS
Phased demolition and construction of a new office-led building with public space, plus alterations to the Porter Tun Room at Adjoining Borough Observations Pseudo Street.
Adjoining Borough Observations Within The Corporation Of London, Adjoining Borough Observations Pseudo Street
- New-Build & Major Development
- Large 8/10
Overview
- Stage
- Decided on 1 Apr 2026: Approved.
As lodged with the council
Observations on a proposed development within the adjoining Borough of City of London with respect to: 'This development is proposed to be a phased development (phase 1: demolition, phase 2 construction) comprising: the demolition of the existing buildings, partial retention of the existing basement (including creation of a mezzanine) and construction of a new building for office use (Class E(g)), flexible office/community use (Class E(g)/F2), flexible cultural/event uses (Sui Generis) and flexible retail/service/food and beverage uses (Class E(a)-(c)); comprising a basement level, ground and 20 upper storeys plus roof plant level; creation of new public space and new pedestrian routes at ground level; hard and soft landscaping; pedestrian and vehicle access; blue badge car and cycle parking; ancillary servicing, plant and other back of house space; excavation to accommodate attenuation tank beneath existing basement slab, external alterations and demolition to the south elevation of the adjoining Porter Tun Room of the former Whitbread Brewery; associated highway works, enabling works and other works associated with the development.' AT: 1 Silk Street, London, EC2Y 8AL (for 25/00829/FULEIA) AND 'External alterations to the south elevation of the Porter Tun Room of the former Whitbread Brewery in connection with the development at 1 Silk Street. Demolition of the brick casing and removal of services and a vent belonging to 1 Silk Street, fixed against the brewery building elevation, including making good of any existing brickwork.' AT: Porter Tun Room, The Brewery, Milton Street, London, EC1Y 4SA (for 25/00830/LBC).
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application LAMBETH/26/00622/OBS?
Follow it on City Scope. This page is checked against the Lambeth planning register and shows the latest status, decision and documents for LAMBETH/26/00622/OBS. To comment on the application, use the Lambeth planning portal.
The impact
What it involves.
Where it’s at
The council has decided on 1 April 2026.
- Validated25 Feb 2026The council has everything it needs.
- Comments closed18 Mar 2026Usual deadline. Late comments may still count.
- Target decision22 Apr 20268-week target for minor and other applications.
- Decision1 Apr 2026Approved.
Planning terms
- Use class E
- Commercial, business and service uses, such as shops, cafés, offices, gyms and clinics. A building can switch between them without planning permission.
- Sui generis
- A use in a class of its own, such as a pub, a hot food takeaway or a large shared house. Any change needs planning permission.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- LAMBETH/26/00622/OBS
- Address
- Adjoining Borough Observations Within The Corporation Of London, Adjoining Borough Observations Pseudo Street
- Status
- Approved
- Council decision
- Approved
- Decision issued
- Category
- New-Build & Major Development
- Impact scale
- 8/10
- Authority
- Lambeth
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
