Planning applicationMOR/25/01005/S36

Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

696 of 697 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.

Proposals and decisions come from Moray Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

14 August 2025

Validated

14 August 2025

Planning Signals

3 detected traits

Specific
Associated InfrastructureSection 36 ConsentWind Turbine
AI summary

Dorrenell Extension Wind Farm proposes 67 large turbines (up to 250m) plus grid upgrades and battery energy storage.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application MOR/25/01005/S36

Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Moray Council

Dorrenell Extension Wind Farm proposes 67 large turbines (up to 250m) plus grid upgrades and battery energy storage.

Reference
MOR/25/01005/S36
Address
Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Moray Council
Received
Validated
Last scraped
Record created
Latitude
57.377655
Longitude
-3.061592

Plain-language summary

Dorrenell Extension Wind Farm proposes 67 large turbines (up to 250m) plus grid upgrades and battery energy storage.

As filed with the council

Construct and operate a wind energy generating station of 67 wind turbines with ground to blade tip heights varying of 149.9m to 250m with associated infrastructure and includes a battery energy storage system at