Planning application · MOR/25/01005/S36
67 wind turbines and a battery storage system proposed at Dorenell.
Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
Large renewable energy development with significant landscape impact and public interest.
- Proposed
- A wind energy generating station with 67 turbines, associated infrastructure and a battery energy storage system.
- Size
- 67 wind turbines · 149.9 m to 250m turbine height
- Stage
- Past its target date of 14 Oct 2025.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is to construct and operate a wind energy generating station at Dorenell Wind Farm, including 67 wind turbines and a battery energy storage system. The turbines would have ground-to-blade-tip heights ranging from 149.9m to 250m. The application is awaiting a decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
696 of 697 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.
Proposals and decisions come from Moray Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application MOR/25/01005/S36?
Follow it on City Scope. This page is checked against the Moray Council planning register and shows the latest status, decision and documents for MOR/25/01005/S36. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Moray Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes 67 wind turbines, with ground-to-blade-tip heights ranging from 149.9m to 250m.
- 02
A battery energy storage system and associated infrastructure are also proposed.
Tags
- Associated Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Section 36 Consent
- “/S36”
- Wind Turbine
- “wind energy generating station”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received14 Aug 2025
- Validated14 Aug 2025The council has everything it needs.
- Comments closed4 Sept 2025Usual deadline. Late comments may still count.
- Target decision (next)14 Oct 20252-month target for local developments.
- DecisionNot yet
The record
- Reference
- MOR/25/01005/S36
- Address
- Dorenell Wind Farm Lower Cabrach Huntly Moray AB54 4ES
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Moray Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Speyside Glenlivet
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







