590 sq m substation proposed beside Berryburn.
Land Adjacent To Electricity Substation Berryburn Dunphail Forres Moray
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Medium 6/10
- Access Changes
- Associated Infrastructure
- Boundary Treatment
- Drainage Wastewater Infrastructure
- Electrical Infrastructure
Overview
Why it’s worth watching
High-voltage substation construction is transformative infrastructure with significant landscape and community impact.
- Today
- Berryburn substation, agricultural land and commercial forestry land.
- Proposed
- A new 275 / 33kV substation and associated works.
- Size
- 590 m² proposed floorspace · 8.36 ha site area
- Stage
- Decided on 30 Oct 2026: Permitted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought planning permission to build a new 275 / 33kV Corshellach substation beside the existing Berryburn substation, south of Forres. The works include earthworks, landscaping, site drainage, an access, enclosure and temporary construction compounds. The application was permitted. The form names pre-application discussion under reference 25/00371/PEMAJ/EM/LMC.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
696 of 697 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.
Proposals and decisions come from Moray Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application MOR/26/00149/APP?
Follow it on City Scope. This page is checked against the Moray Council planning register and shows the latest status, decision and documents for MOR/26/00149/APP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Moray Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Earthworks would form a platform for the substation.
- 02
The proposal includes landscaping, site drainage and means of enclosure.
- 03
The works include an access and temporary construction compounds.
- 04
The number of parking spaces would change from 2 to 4.
Questions
Has the application been decided?
Yes. The application was permitted.
Was there pre-application discussion?
Yes. The form records a meeting and feedback by letter under reference 25/00371/PEMAJ/EM/LMC.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Boundary Treatment
- Landscaping
- Access Changes
- Associated Infrastructure
- Drainage Wastewater Infrastructure
- Electrical Infrastructure
- Substation
- Temporary Construction Compound
What each tag is based on
- Access Changes
- “means of access”
- Associated Infrastructure
- “associated undertaking of earthworks formation of platform landscaping means of access means of enclosure site drainage”
- Boundary Treatment
- “means of enclosure”
- Drainage Wastewater Infrastructure
- “site drainage”
- Electrical Infrastructure
- “275 / 33kV Corshellach substation”
- Landscaping
- “landscaping”
- Substation
- “Construct a 275 / 33kV Corshellach substation”
- Temporary Construction Compound
- “temporary construction compounds”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 30 October 2026.
- Received5 Feb 2026
- Validated27 Feb 2026The council has everything it needs.
- Comments closed20 Mar 2026Usual deadline. Late comments may still count.
- Target decision27 Jun 20264-month target for major developments.
- Decision30 Oct 2026Permitted.
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- MOR/26/00149/APP
- Address
- Land Adjacent To Electricity Substation Berryburn Dunphail Forres Moray
- Status
- Decided
- Council decision
- Permitted
- Decision issued
- Category
- New-Build & Major Development
- Impact scale
- 6/10
- Authority
- Moray Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.