Planning applicationNAY/25/00334/PP

Site To North Of 1 Dunlop Place Meadowhead Industrial Estate Irvine North Ayrshire

Pending DecisionRenewable Energy & Sustainability
Official records · coverage in progress

473 of 482 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 9 records from that period are still being added or checked.

Proposals and decisions come from North Ayrshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

24 July 2025

Validated

28 July 2025

Planning Signals

2 detected traits

Specific
Associated InfrastructureWind Turbine
Application Insights

No form insights available yet.

AI summary

Proposed single wind turbine (up to 185m blade tip) with associated ground works and infrastructure at Meadowhead Red Line site.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NAY/25/00334/PP

Site To North Of 1 Dunlop Place Meadowhead Industrial Estate Irvine North Ayrshire

Pending DecisionRenewable Energy, EV & Heat PumpsReceived North Ayrshire Council

Proposed single wind turbine (up to 185m blade tip) with associated ground works and infrastructure at Meadowhead Red Line site.

Reference
NAY/25/00334/PP
Address
Site To North Of 1 Dunlop Place Meadowhead Industrial Estate Irvine North Ayrshire
Status
Pending Decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
North Ayrshire Council
Received
Validated
Last scraped
Record created
Latitude
55.5881
Longitude
-4.6431

Plain-language summary

Proposed single wind turbine (up to 185m blade tip) with associated ground works and infrastructure at Meadowhead Red Line site.

As filed with the council

Erection of 1 no. wind turbine of up to 185m to blade tip and associated infrastructure

City Scope Journal

Coal Authority flags possible old workings at Irvine turbine site

A statutory consultation response recommends ground checks and any necessary mitigation before above-ground work. The proposal remains pending.

Read the Journal article →