Planning application · NAY/25/00334/PP
Wind turbine up to 185m proposed at Meadowhead Industrial Estate.
Site To North Of 1 Dunlop Place Meadowhead Industrial Estate Irvine North Ayrshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Associated Infrastructure
- Wind Turbine
Overview
Why it’s worth watching
Consent is sought for a 185m-to-blade-tip wind turbine and associated infrastructure on land north of Dunlop Place, Irvine, a large renewable energy development with landscape and local impact.
- Today
- Vacant or industrial land.
- Proposed
- One wind turbine up to 185m to blade tip, with associated infrastructure.
- Size
- 30 years permission period sought · 3.80 ha site area
- Stage
- Decided on 8 Oct 2026: Approved subject to Conditions.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application was for one wind turbine, up to 185m to the blade tip, with associated infrastructure at land described as vacant or industrial. The form says the permission is sought for 30 years and is temporary. The council’s record says it was approved subject to conditions.
Written with AI from the application form and the council record.
Read our story
Coal Authority flags possible old workings at Irvine turbine site
A statutory consultation response recommends ground checks and any necessary mitigation before above-ground work. The proposal remains pending.
City Scope Journal →Keep reading
Official records · coverage in progress
473 of 482 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 9 records from that period are still being added or checked.
Proposals and decisions come from North Ayrshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application NAY/25/00334/PP?
Follow it on City Scope. This page is checked against the North Ayrshire Council planning register and shows the latest status, decision and documents for NAY/25/00334/PP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the North Ayrshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A wind turbine up to 185m to blade tip is proposed.
- 02
Associated infrastructure is proposed; the description does not specify what it includes.
Questions
What is the application’s decision?
The council’s record says it was approved subject to conditions.
Was earlier planning advice sought?
Yes. The form lists pre-application advice about the proposed turbine height under reference 24/00486/PREAPP.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “associated infrastructure”
- Wind Turbine
- “Erection of 1 no. wind turbine”, “up to 185m to blade tip”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
The council has decided on 8 October 2026.
- Received24 Jul 2025
- Validated28 Jul 2025The council has everything it needs.
- Comments closed18 Aug 2025Usual deadline. Late comments may still count.
- Target decision28 Nov 20254-month target for major developments.
- Decision8 Oct 2026Approved subject to Conditions.
Linked application
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- NAY/25/00334/PP
- Address
- Site To North Of 1 Dunlop Place Meadowhead Industrial Estate Irvine North Ayrshire
- Status
- Approved subject to Conditions
- Council decision
- Approved subject to Conditions
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- North Ayrshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







