Planning application · NAY/25/00590/PP
Underground cables proposed to link Swinlees Wind Farm with DSM-Firmenich.
Land To South Of South Hourat Farm To DSM Firmenich Via B784 and B780 Dalry North Ayrshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Telecommunications
- Small 4/10
- Associated Infrastructure
- Industrial Logistics
- Substation Connection Works
- Underground Electrical Cabling
- Wind Turbine
Overview
- Today
- The site is described as agricultural land and highway.
- Proposed
- Underground cables and associated infrastructure connecting Swinlees Wind Farm with DSM-Firmenich.
- Size
- 41.70 ha site area · 30 years permission period
- Stage
- Decided: Approved with no Conditions.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought permission to install underground cables and associated infrastructure between the consented Swinlees Wind Farm and DSM-Firmenich. The route is described as crossing land associated with Swinlees Wind Farm, South Hourat and the B784 at Dalry. The permission is approved with no conditions. The form says it is temporary, for 30 years in association with the wind farm consent, reference 24/00843/PPM.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
473 of 482 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 9 records from that period are still being added or checked.
Proposals and decisions come from North Ayrshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application NAY/25/00590/PP?
Follow it on City Scope. This page is checked against the North Ayrshire Council planning register and shows the latest status, decision and documents for NAY/25/00590/PP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the North Ayrshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Underground cables would be installed to connect the consented Swinlees Wind Farm with DSM-Firmenich.
- 02
The application identifies the route as involving land associated with the wind farm, South Hourat and the B784 at Dalry.
Questions
Has the application been decided?
Yes. It is approved with no conditions.
Is this a permanent permission?
The form describes it as temporary and says permission is required for 30 years in association with the Swinlees Wind Farm consent.
Does the form identify changes to access or public paths?
No. The form says no new or altered vehicle access is proposed and no change to public paths or access is proposed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Industrial Logistics
- Substation Connection Works
- Underground Electrical Cabling
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “to include ancillary infrastructure”
- Industrial Logistics
- “DSM-Firmenich”
- Substation Connection Works
- “connect the consented Swinlees Wind Farm with DSM-Firmenich”
- Underground Electrical Cabling
- “Installation of underground cables”
- Wind Turbine
- “connect the consented Swinlees Wind Farm”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received22 Dec 2025
- Validated26 Jan 2026The council has everything it needs.
- Comments closed16 Feb 2026Usual deadline. Late comments may still count.
- Target decision26 May 20264-month target for major developments.
- DecisionApproved with no Conditions
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- NAY/25/00590/PP
- Address
- Land To South Of South Hourat Farm To DSM Firmenich Via B784 And B780 Dalry North Ayrshire
- Status
- Approved with no Conditions
- Category
- Telecommunications
- Impact scale
- 4/10
- Authority
- North Ayrshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.