Planning applicationNES/25/00199/FFPA

Noster Fish Farm Loch Seaforth Maraig Isle Of Harris

DecidedNew-Build & Major Development
Official records · coverage in progress

454 of 455 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.

Proposals and decisions come from Comhairle nan Eilean Siar. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

5 June 2025

Validated

9 June 2025

Planning Signals

2 detected traits

Specific
Aquaculture HatcheryFish Farming Mooring Pen
AI summary

A proposed 160m-circumference aquaculture pen within the existing mooring grid could reduce stocking density without altering anchors or biomass limits.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NES/25/00199/FFPA

Noster Fish Farm Loch Seaforth Maraig Isle Of Harris

DecidedNew-Build & Major DevelopmentReceived Comhairle nan Eilean Siar

A proposed 160m-circumference aquaculture pen within the existing mooring grid could reduce stocking density without altering anchors or biomass limits.

Reference
NES/25/00199/FFPA
Address
Noster Fish Farm Loch Seaforth Maraig Isle Of Harris
Status
Decided
Category
New-Build & Major Development
Impact scale
5/10
Authority
Comhairle nan Eilean Siar
Received
Validated
Last scraped
Record created
Latitude
57.935
Longitude
-6.6833

Plain-language summary

A proposed 160m-circumference aquaculture pen within the existing mooring grid could reduce stocking density without altering anchors or biomass limits.

As filed with the council

Install a 160m pen circumference pen within an existing mooring grid of 90m matrix (No change to anchors or mooring area; No increase in site maximum standing biomass of 2200t. This additional pen will allow a reduction in the site stocking density)