Planning applicationNES/25/00245/OHL

11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis

DecidedMechanical Plant, Flues & Ventilation
Official records · coverage in progress

454 of 455 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.

Proposals and decisions come from Comhairle nan Eilean Siar. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

7 July 2025

Validated

7 July 2025

Planning Signals

4 detected traits

Specific
Overhead Utility LinesSpur Overhead Line ConnectionSubstationUnderground Electrical Cabling
AI summary

Plans for a new 11kV overhead line spur in Ardroil, with a new pole, 100kV transformer, and short underground LV cable (~120m).

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NES/25/00245/OHL

11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis

DecidedMechanical Plant, Flues & VentilationReceived Comhairle nan Eilean Siar

Plans for a new 11kV overhead line spur in Ardroil, with a new pole, 100kV transformer, and short underground LV cable (~120m).

Reference
NES/25/00245/OHL
Address
11Kva Overhead Line Spur Ardroil Uig Isle Of Lewis
Status
Decided
Category
Mechanical Plant, Flues & Ventilation
Impact scale
6/10
Authority
Comhairle nan Eilean Siar
Received
Validated
Last scraped
Record created
Latitude
58.1823
Longitude
-7.0215

Plain-language summary

Plans for a new 11kV overhead line spur in Ardroil, with a new pole, 100kV transformer, and short underground LV cable (~120m).

As filed with the council

New 11Kva Over Headline spur in Ardroil, Isle of Lewis. This new line would consist of 2 new spans in total, for a length of approx. 120 Meters. The line would consist of 2 single poles and a total of 3 support stays, one on existing pole No.219 and two on the new pole No.2. The pole heights are documented below and the overhead line design is shown on the attached plan. The final single pole will have a 100KV Transformer installed on it and a section of underground Low Voltage cable then going from the base of the pole to the new Supply point. (approx. 30 mtrs)