Planning applicationNES/25/00311/PPD

Dualchas Heritage And Cultural Centre Castlebay Castlebay Isle Of Barra HS9 5XD

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

454 of 455 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.

Proposals and decisions come from Comhairle nan Eilean Siar. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

29 August 2025

Validated

18 September 2025

Planning Signals

2 detected traits

Works
Solar
Specific
Battery Storage
Application Insights

No form insights available yet.

AI summary

Rear solar PV and battery installation proposed for the Heritage Centre, with an ~10kW array and ~5kWh storage.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NES/25/00311/PPD

Dualchas Heritage And Cultural Centre Castlebay Castlebay Isle Of Barra HS9 5XD

DecidedRenewable Energy, EV & Heat PumpsReceived Comhairle nan Eilean Siar

Rear solar PV and battery installation proposed for the Heritage Centre, with an ~10kW array and ~5kWh storage.

Reference
NES/25/00311/PPD
Address
Dualchas Heritage And Cultural Centre Castlebay Castlebay Isle Of Barra HS9 5XD
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Comhairle nan Eilean Siar
Received
Validated
Last scraped
Record created
Latitude
56.9559
Longitude
-7.4954

Plain-language summary

Rear solar PV and battery installation proposed for the Heritage Centre, with an ~10kW array and ~5kWh storage.

As filed with the council

Installation of a 10Kw Solar panel array and a 5Kwh battery system at the rear of the building.