454 of 455 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 1 records from that period are still being added or checked.

Proposals and decisions come from Comhairle nan Eilean Siar. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

8 May 2026

Validated

2 June 2026

Planning Signals

10 detected traits

Specific
Access ChangesAccess RoadsAssociated InfrastructureElectrical InfrastructureRail InfrastructureRailway Infrastructure
Application Insights

No form insights available yet.

AI summary

Plans for onshore power transmission for Spiorad na Mara: multiple underground cables, joint bays, two substations near Stornoway, and new access tracks.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NES/26/00167/PPDM

Onshore Transmission Works Spiorad Na Mara Offshore Wind Farm Barvas Isle Of Lewis

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Comhairle nan Eilean Siar

Plans for onshore power transmission for Spiorad na Mara: multiple underground cables, joint bays, two substations near Stornoway, and new access tracks.

Reference
NES/26/00167/PPDM
Address
Onshore Transmission Works Spiorad Na Mara Offshore Wind Farm Barvas Isle Of Lewis
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Comhairle nan Eilean Siar
Received
Validated
Last scraped
Record created
Latitude
58.2935
Longitude
-6.4455

Plain-language summary

Plans for onshore power transmission for Spiorad na Mara: multiple underground cables, joint bays, two substations near Stornoway, and new access tracks.

As filed with the council

Construction, operation and decommissioning of onshore electricity transmission infrastructure associated with the Spiorad na Mara Offshore Windfarm, comprising: up to 12 electricity cables and associated transmission joint bays (TJBs) to the landfall point; up to two onshore substations (one located at landfall and one to the southwest of Stornoway); underground electricity cables and associated infrastructure connecting the TJBs and onshore substation(s) with the SSEN Lewis Hub; temporary and permanent access roads and tracks; and associated access, ancillary infrastructure and works. [Note: Representations to be submitted to Comhairle nan Eilean Siar by 12 July 2026 - see press advert]