Planning applicationNLK/25/00912/ECU

Street Record Horsley Brae Overtown North Lanarkshire

CommentsWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

849 of 945 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 96 records from that period are still being added or checked.

Proposals and decisions come from North Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

26 August 2025

Validated

28 August 2025

Planning Signals

4 detected traits

Specific
Eia ScopingSection 36 ConsentWind TurbineWind Turbine Count 8
AI summary

Scoping for major energy scheme: up to eight 200m turbines plus solar PV and long-duration battery storage, with associated infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NLK/25/00912/ECU

Street Record Horsley Brae Overtown North Lanarkshire

CommentsRenewable Energy, EV & Heat PumpsReceived North Lanarkshire Council

Scoping for major energy scheme: up to eight 200m turbines plus solar PV and long-duration battery storage, with associated infrastructure.

Reference
NLK/25/00912/ECU
Address
Street Record Horsley Brae Overtown North Lanarkshire
Status
Comments
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
North Lanarkshire Council
Received
Validated
Last scraped
Record created
Latitude
55.7377
Longitude
-3.923

Plain-language summary

Scoping for major energy scheme: up to eight 200m turbines plus solar PV and long-duration battery storage, with associated infrastructure.

As filed with the council

Scoping Opinion Request for Proposed Section 36 Application. Erection of 8 Turbines with a Maximum Height to Blade Tip of 200m, Approximately 30 Megawatts (MW) of Solar Photovoltaic (PV) Energy Generation, and Approximately 50 MW of Long Duration Electricity Storage (LDES), and Associated Infrastructure. Scottish Government Consultation Neighbouring Authority