Planning application · NLK/25/00912/ECU
Scoping request for 8 turbines, solar power and energy storage at Horsley Brae.
Street Record Horsley Brae Overtown North Lanarkshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Eia Scoping
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 8
Overview
Why it’s worth watching
Major renewable energy and storage proposal with clear regional infrastructure significance and a formal scoping consultation.
- Proposed
- 8 turbines, solar photovoltaic generation and long-duration electricity storage
- Size
- 200 m to blade tip maximum turbine height
- Stage
- Council responded on 2 Sept 2025: Comments.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a request for a scoping opinion ahead of a proposed Section 36 application. A scoping opinion sets out what environmental matters should be assessed in an application. The proposal described includes 8 turbines, solar photovoltaic power generation and long-duration electricity storage, with associated infrastructure. North Lanarkshire Council is listed as a neighbouring authority consulted by the Scottish Government.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
849 of 945 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 96 records from that period are still being added or checked.
Proposals and decisions come from North Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application NLK/25/00912/ECU?
Follow it on City Scope. This page is checked against the North Lanarkshire Council planning register and shows the latest status, decision and documents for NLK/25/00912/ECU. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the North Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The proposal includes 8 turbines, with a maximum height of 200m to blade tip.
- 02
Solar photovoltaic panels and long-duration electricity storage are included in the proposal.
- 03
Associated infrastructure is included, but the description does not give details.
Questions
Is this an application to build the development?
No. It is a request for a scoping opinion ahead of a proposed Section 36 application.
What has the council decided?
The record says the council's response is “Comments”.
Tags
- Eia Scoping
- Section 36 Consent
- Wind Turbine
- Wind Turbine Count 8
What each tag is based on
- Eia Scoping
- “Scoping Opinion Request”
- Section 36 Consent
- “Proposed Section 36 Application”
- Wind Turbine
- “Erection of 8 Turbines with a Maximum Height to Blade Tip of 200m”
- Wind Turbine Count 8
- “Erection of 8 Turbines”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 2 September 2025.
- Received26 Aug 2025
- Validated28 Aug 2025The council has everything it needs.
- Comments closed18 Sept 2025Usual deadline. Late comments may still count.
- Target decision28 Oct 20252-month target for local developments.
- Decision2 Sept 2025Comments.
The record
- Reference
- NLK/25/00912/ECU
- Address
- Street Record Horsley Brae Overtown North Lanarkshire
- Status
- Comments
- Council decision
- Comments
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- North Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







