Application NLK/25/00912/ECU
Street Record Horsley Brae Overtown North Lanarkshire
Scoping for major energy scheme: up to eight 200m turbines plus solar PV and long-duration battery storage, with associated infrastructure.
The record
- Reference
- NLK/25/00912/ECU
- Address
- Street Record Horsley Brae Overtown North Lanarkshire
- Status
- Comments
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- North Lanarkshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.7377
- Longitude
- -3.923
What is proposed
Plain-language summary
Scoping for major energy scheme: up to eight 200m turbines plus solar PV and long-duration battery storage, with associated infrastructure.
As filed with the council
Scoping Opinion Request for Proposed Section 36 Application. Erection of 8 Turbines with a Maximum Height to Blade Tip of 200m, Approximately 30 Megawatts (MW) of Solar Photovoltaic (PV) Energy Generation, and Approximately 50 MW of Long Duration Electricity Storage (LDES), and Associated Infrastructure. Scottish Government Consultation Neighbouring Authority