Planning application · NLK/26/00239/CLP
52kW of roof-mounted solar panels proposed for the community centre.
Indoor Bowling Centre Quarry Street Cliftonville Coatbridge North Lanarkshire ML5 3PU
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Certificate Of Lawfulness
- Inverter
- Roof Mounted Solar Panels
Overview
- Today
- An existing community centre building.
- Proposed
- A roof-mounted solar photovoltaic system rated at 52kW, with mounting rails, an inverter and associated electrical equipment.
- Size
- 52 kW solar system capacity
- Stage
- Decided: Decided - Permitted Development.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a 52kW solar photovoltaic system on the existing community centre building. It would include mounting rails, an inverter and associated electrical equipment. The recorded decision is “Permitted Development”.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
849 of 945 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 96 records from that period are still being added or checked.
Proposals and decisions come from North Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application NLK/26/00239/CLP?
Follow it on City Scope. This page is checked against the North Lanarkshire Council planning register and shows the latest status, decision and documents for NLK/26/00239/CLP. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the North Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Solar panels and mounting rails would be installed on the community centre roof.
- 02
An inverter and associated electrical equipment would be installed; the description does not say where.
Tags
- Certificate Of Lawfulness
- Inverter
- Roof Mounted Solar Panels
What each tag is based on
- Certificate Of Lawfulness
- “26/00239/CLP”
- Inverter
- “inverter”
- Roof Mounted Solar Panels
- “roof-mounted solar photovoltaic (PV) system”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received5 Mar 2026
- Validated9 Apr 2026The council has everything it needs.
- Comments closed30 Apr 2026Usual deadline. Late comments may still count.
- Target decision9 Jun 20262-month target for local developments.
- DecisionDecided - Permitted Development
Planning terms
- Certificate of lawfulness (proposed)
- Confirms that planned work would not need planning permission.
The record
- Reference
- NLK/26/00239/CLP
- Address
- Indoor Bowling Centre Quarry Street Cliftonville Coatbridge North Lanarkshire ML5 3PU
- Status
- Decided - Permitted Development
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- North Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Coatbridge North
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.