Planning applicationNLK/26/00790/ECU

Unknown Address

Pending ConsiderationWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

849 of 945 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 96 records from that period are still being added or checked.

Proposals and decisions come from North Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

30 June 2026

Validated

30 June 2026

Planning Signals

5 detected traits

Specific
Overhead Utility LinesSection 37 ConsentTemporary Ohl AccessTower ContextTower Foundation Upgrades And Strengthening
AI summary

Uprating an existing overhead power line to 400kV between Denny North and Bonnybridge, replacing conductors and strengthening towers with associated works.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application NLK/26/00790/ECU

Pending ConsiderationRenewable Energy, EV & Heat PumpsReceived North Lanarkshire Council

Uprating an existing overhead power line to 400kV between Denny North and Bonnybridge, replacing conductors and strengthening towers with associated works.

Reference
NLK/26/00790/ECU
Status
Pending Consideration
Category
Renewable Energy, EV & Heat Pumps
Impact scale
6/10
Authority
North Lanarkshire Council
Received
Validated
Last scraped
Record created
Latitude
56.0221
Longitude
-3.8688

Plain-language summary

Uprating an existing overhead power line to 400kV between Denny North and Bonnybridge, replacing conductors and strengthening towers with associated works.

As filed with the council

As a neighbouring authority Consultation from Scottish Government (Energy Consent Unit) - Section 37 & Schedule 8: Application for uprating of existing overhead line (OHL) ZG route from 275kV to 400kV between Denny North substation and Bonnybridge substation. Works include replacement of existing conductors (overhead line wires), downleads, temporary accesses, tower foundation upgrades and tower strengthening and associated works. (EIA Development) ECU00006375