Planning applicationORK/25/203/TPPMAJ

Land Near Greentoft/Neven Point, Eday, Orkney

Awaiting decisionWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

312 of 345 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 33 records from that period are still being added or checked.

Proposals and decisions come from Orkney Islands Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

6 June 2025

Validated

23 June 2025

Planning Signals

8 detected traits

Specific
Associated InfrastructureBorrow PitRail InfrastructureRailway InfrastructureRailway StationSubstation
AI summary

Five turbines up to 180m, a 49.9MW battery system, substation and supporting tracks, cabling, hardstandings and borrow pit could be developed.

Impact scale

Estimated scale of impact on the surrounding area.

9/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application ORK/25/203/TPPMAJ

Land Near Greentoft/Neven Point, Eday, Orkney

Awaiting decisionRenewable Energy, EV & Heat PumpsReceived Orkney Islands Council

Five turbines up to 180m, a 49.9MW battery system, substation and supporting tracks, cabling, hardstandings and borrow pit could be developed.

Reference
ORK/25/203/TPPMAJ
Address
Land Near Greentoft/Neven Point, Eday, Orkney
Status
Awaiting decision
Category
Renewable Energy, EV & Heat Pumps
Impact scale
9/10
Authority
Orkney Islands Council
Received
Validated
Last scraped
Record created
Latitude
59.1508
Longitude
-2.7817

Plain-language summary

Five turbines up to 180m, a 49.9MW battery system, substation and supporting tracks, cabling, hardstandings and borrow pit could be developed.

As filed with the council

Erect five wind turbines (maximum height of 180 metres), and battery energy storage system (maximum combined capacity 49.9 MW), a substation, external transformers, and associated infrastructure including access tracks, crane hardstandings, temporary laydown areas, underground cabling, and borrow pit