Planning application · ORK/25/379/SCR
Two 850kW wind turbines, up to 75 metres high, considered for EIA.
Work Farm (Land Near), St Ola, Orkney
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 7/10
- Eia Screening
- Wind Turbine
- Wind Turbine Count 2
Overview
Why it’s worth watching
Proposed two-turbine wind development prompting a formal EIA requirement and consultee responses, a material infrastructure proposal with clear local consequence.
- Proposed
- The screening request concerns two 850kW wind turbines, with a maximum height of 75 metres.
- Size
- 850 kW each capacity · 75 meters maximum height
- Stage
- Council responded on 5 Mar 2026: EIA Required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This is a screening request about two wind turbines near Work Farm, St Ola. Screening is a decision on whether a project needs an Environmental Impact Assessment (EIA), a study of its likely environmental effects. The council decided that an EIA is required.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
312 of 345 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 33 records from that period are still being added or checked.
Proposals and decisions come from Orkney Islands Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ORK/25/379/SCR?
Follow it on City Scope. This page is checked against the Orkney Islands Council planning register and shows the latest status, decision and documents for ORK/25/379/SCR. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Orkney Islands Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Two wind turbines, with a maximum height of 75 metres, are being considered near Work Farm.
Questions
What has the council decided?
It decided that an Environmental Impact Assessment is required. This is a screening decision, not a decision on whether to grant planning permission.
Tags
- Eia Screening
- Wind Turbine
- Wind Turbine Count 2
What each tag is based on
- Eia Screening
- “Screening request”
- Wind Turbine
- “two 850kW wind turbines”
- Wind Turbine Count 2
- “two 850kW wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 5 March 2026.
- Received11 Nov 2025
- Validated11 Nov 2025The council has everything it needs.
- Comments closed2 Dec 2025Usual deadline. Late comments may still count.
- Target decision11 Jan 20262-month target for local developments.
- Decision5 Mar 2026EIA Required.
The record
- Reference
- ORK/25/379/SCR
- Address
- Work Farm (Land Near), St Ola, Orkney
- Status
- Decided
- Council decision
- EIA Required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 7/10
- Authority
- Orkney Islands Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.