Planning application · ORK/26/148/TPPMAJ
Five existing turbines to be replaced at Burgar Hill Wind Farm.
Burgar Hill Wind Farm, Evie, Orkney
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Associated Infrastructure
- Renewable Energy Infrastructure
- Wind Turbine
- Wind Turbine Count 5
Overview
Why it’s worth watching
A defined five-turbine repowering proposal would materially increase maximum tip height and listed export capacity at an existing Orkney wind farm. It remains undecided; the score reflects the proposed physical and energy change, not approval.
- Today
- Wind energy generation and livestock grazing, with five turbines up to 116m to tip.
- Proposed
- Five replacement turbines up to 149.9m to tip, with associated auxiliary infrastructure.
- Size
- 16.90 ha site area · 0 parking proposed
- Stage
- Comments closed. Decision due by 13 Dec 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes replacing five existing wind turbines, currently up to 116m to tip, with five turbines up to 149.9m to tip. It also includes associated auxiliary infrastructure and a new or altered vehicle access. The form records earlier pre-application discussions under PREAPP/003/25 and PREAPP/005/25.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
312 of 345 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 33 records from that period are still being added or checked.
Proposals and decisions come from Orkney Islands Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application ORK/26/148/TPPMAJ?
Follow it on City Scope. This page is checked against the Orkney Islands Council planning register and shows the latest status, decision and documents for ORK/26/148/TPPMAJ. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Orkney Islands Council planning portal.
On the street
What neighbours would notice.
- 01
Five existing turbines would be replaced with five turbines up to 149.9m to tip.
- 02
A new or altered vehicle access to or from a public road is proposed.
- 03
The form records 10 existing parking spaces and proposes 0 spaces.
Questions
What happened before this application?
The form says the council received pre-application engagement requests under PREAPP/003/25 and PREAPP/005/25. The earlier request described four turbines up to 200m to tip; the later one described five turbines up to 149.9m to tip.
What concern did the council raise during pre-application engagement?
The form says the council highlighted turbine height and the resulting impact on the World Heritage Site and surrounding landscape as key matters to consider.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Associated Infrastructure
- Renewable Energy Infrastructure
- Wind Turbine
- Wind Turbine Count 5
What each tag is based on
- Associated Infrastructure
- “with associated auxiliary infrastructure”
- Renewable Energy Infrastructure
- “up to 30MW export”
- Wind Turbine
- “Replace five existing turbines”, “with 5 wind turbines”
- Wind Turbine Count 5
- “Replace five existing turbines”, “with 5 wind turbines”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 13 December.
- Received19 May 2026
- Validated13 Aug 2026The council has everything it needs.
- Comments closed3 Sept 2026Usual deadline. Late comments may still count.
- Target decision (next)13 Dec 20264-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- ORK/26/148/TPPMAJ
- Address
- Burgar Hill Wind Farm, Evie, Orkney
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Orkney Islands Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.