Planning applicationPKC/25/01577/LBC

19 Barossa Place Perth PH1 5HH

DecidedRenewable Energy & Sustainability
Official records · coverage in progress

1,141 of 1,475 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 334 records from that period are still being added or checked.

Proposals and decisions come from Perth and Kinross Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

28 October 2025

Validated

11 December 2025

Planning Signals

5 detected traits

Works
Windows & DoorsInternal Alterations
Context
Listed Building
Specific
Energy Efficiency ImprovementsListed Building Consent Context
Application Insights

No form insights available yet.

AI summary

Replacement windows with an air source heat pump and solar panels proposed to improve the homes energy performance.

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application PKC/25/01577/LBC

19 Barossa Place Perth PH1 5HH

DecidedRenewable Energy, EV & Heat PumpsReceived Perth and Kinross Council

Replacement windows with an air source heat pump and solar panels proposed to improve the homes energy performance.

Reference
PKC/25/01577/LBC
Address
19 Barossa Place Perth PH1 5HH
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
3/10
Authority
Perth and Kinross Council
Received
Validated
Last scraped
Record created
Latitude
56.401
Longitude
-3.4345

Plain-language summary

Replacement windows with an air source heat pump and solar panels proposed to improve the homes energy performance.

As filed with the council

Alterations and installation of replacement windows, air source heat pump and solar panels