Application PKC/26/01230/SCOP
Land 120 Metres South East Of Wardheads Farm Errol Perth PH2 7SW
Scoping application for a solar farm of up to 500MW, with up to 100MW of battery storage and associated infrastructure.
The record
- Reference
- PKC/26/01230/SCOP
- Address
- Land 120 Metres South East Of Wardheads Farm Errol Perth PH2 7SW
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 10/10
- Authority
- Perth and Kinross Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 56.4192
- Longitude
- -3.2007
What is proposed
Plain-language summary
Scoping application for a solar farm of up to 500MW, with up to 100MW of battery storage and associated infrastructure.
As filed with the council
The construction and operation of up to 500MW ground-mounted solar PV farm together with up to 100MW co-located BESS and associated infrastructure including inverter/transformer stations, substations (including Site substation and Transmission Operator Grid substation), underground cabling, access tracks, temporary construction compounds, security fencing, CCTV, landscaping, and biodiversity enhancements