Planning application · REN/26/0587/EIASCO
Around 124 new wind turbines proposed at Whitelee Windfarm.
Eaglesham Moor 15km South Of Glasgow 6km Southwest Of East Kilbride
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Demolition
- Eia Scoping
- Wind Turbine
Overview
Why it’s worth watching
Scoping consultation covers removal of existing Whitelee turbines and installation of about 124 new turbines up to 250m with associated infrastructure, a material change at Scotland's largest onshore windfarm.
- Today
- Operational Whitelee Windfarm turbines
- Proposed
- Remove the operational turbines and install around 124 new turbines
- Size
- 250 m maximum tip height
- Stage
- Council responded on 17 Aug 2026: No Objection.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks an environmental impact assessment scoping opinion for a proposed development at Whitelee Windfarm. Scoping is about identifying what an environmental impact assessment should cover. The proposal anticipates removing the operational turbines and installing around 124 new turbines, with associated infrastructure. Renfrewshire Council recorded “No Objection” to the scoping consultation; this is not a decision granting permission for the development.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
689 of 712 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 23 records from that period are still being added or checked.
Proposals and decisions come from Renfrewshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application REN/26/0587/EIASCO?
Follow it on City Scope. This page is checked against the Renfrewshire Council planning register and shows the latest status, decision and documents for REN/26/0587/EIASCO. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Renfrewshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The operational Whitelee Windfarm turbines would be decommissioned and removed.
- 02
Around 124 new wind turbines are proposed, with a maximum tip height of 250m.
- 03
Associated infrastructure is proposed, but the description does not specify what it would include.
Questions
What does the council’s “No Objection” decision mean?
It is the recorded decision on the scoping consultation. It does not grant permission for the proposed development.
Tags
- Demolition
- Associated Infrastructure
- Eia Scoping
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “and associated infrastructure”
- Demolition
- “decommissioning and removal of the operational Whitelee Windfarm turbines”
- Eia Scoping
- “EIA Scoping Opinion”
- Wind Turbine
- “installation of around 124 new wind turbines”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 17 August 2026.
- Received28 Jul 2026
- Validated28 Jul 2026The council has everything it needs.
- Comments closed18 Aug 2026Usual deadline. Late comments may still count.
- Target decision28 Sept 20262-month target for local developments.
- Decision17 Aug 2026No Objection.
The record
- Reference
- REN/26/0587/EIASCO
- Address
- Eaglesham Moor 15km South Of Glasgow 6km Southwest Of East Kilbride
- Status
- Decided
- Council decision
- No Objection
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Renfrewshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.