Planning application · SBO/25/00981/SCO
Wind farm with up to eight turbines proposed at Hagshaw Hill.
Hagshaw Hill III Wind Farm South Lanarkshire
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Eia Scoping
- Substation
- Wind Turbine
- Wind Turbine Count 8
Overview
Why it’s worth watching
Proposal for up to eight 200m wind turbines plus solar PV and long-duration electricity storage with roughly 138 MW capacity and associated infrastructure.
- Proposed
- Wind turbines, solar energy generation, electricity storage and associated infrastructure
- Size
- 200 metres maximum blade tip height
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes a proposed development with up to eight wind turbines, solar photovoltaic energy generation and long-duration electricity storage. It also includes associated infrastructure, and the total generating capacity is expected to be approximately 138 MW. The record gives no decision outcome.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/25/00981/SCO?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/25/00981/SCO. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Scottish Borders Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Wind turbines are proposed, with a maximum blade tip height of 200 metres.
- 02
Solar photovoltaic energy generation is proposed.
- 03
Long-duration electricity storage and associated infrastructure are proposed.
Tags
- Eia Scoping
- Substation
- Wind Turbine
- Wind Turbine Count 8
What each tag is based on
- Eia Scoping
- “25/00981/SCO”, “The proposed development is for up to eight wind turbines”
- Substation
- “substations and grid connections”
- Wind Turbine
- “up to eight wind turbines”, “maximum blade tip height of 200 metres”
- Wind Turbine Count 8
- “up to eight wind turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received24 Jul 2025
- Validated24 Jul 2025The council has everything it needs.
- Comments closed14 Aug 2025Usual deadline. Late comments may still count.
- Target decision24 Sept 20252-month target for local developments.
- DecisionDecided
The record
- Reference
- SBO/25/00981/SCO
- Address
- Hagshaw Hill III Wind Farm South Lanarkshire
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







