Planning applicationSBO/25/00981/SCO

Hagshaw Hill III Wind Farm South Lanarkshire

DecidedWorth watchingRenewable Energy & Sustainability
Official records · analysis in progress

1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.

Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

24 July 2025

Validated

24 July 2025

Planning Signals

4 detected traits

Specific
Eia ScopingSubstationWind TurbineWind Turbine Count 8
AI summary

Up to eight 200m wind turbines, solar PV and long-duration battery storage, with substations and grid connections proposed across the site.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SBO/25/00981/SCO

Hagshaw Hill III Wind Farm South Lanarkshire

DecidedRenewable Energy, EV & Heat PumpsReceived Scottish Borders Council

Up to eight 200m wind turbines, solar PV and long-duration battery storage, with substations and grid connections proposed across the site.

Reference
SBO/25/00981/SCO
Address
Hagshaw Hill III Wind Farm South Lanarkshire
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Scottish Borders Council
Received
Validated
Last scraped
Record created
Latitude
55.8781
Longitude
-2.0655

Plain-language summary

Up to eight 200m wind turbines, solar PV and long-duration battery storage, with substations and grid connections proposed across the site.

As filed with the council

The proposed development is for up to eight wind turbines with a maximum blade tip height of 200 metres (m), solar photovoltaic (PV) energy generation, and Long Duration Electricity Storage (LDES), and associated infrastructure. The total generating capacity is expected to be approximately 138 MW