Planning applicationSBO/25/01333/S36

Crystal Rig Wind Farm Cranshaws Duns Scottish Borders

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · analysis in progress

1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.

Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

24 September 2025

Validated

24 September 2025

Planning Signals

2 detected traits

Specific
Section 36 ConsentWind Turbine
AI summary

Proposed repower of Crystal Rig I wind farm with up to 10 new turbines, reaching up to around 230m blade-tip height.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SBO/25/01333/S36

Crystal Rig Wind Farm Cranshaws Duns Scottish Borders

RegisteredRenewable Energy, EV & Heat PumpsReceived Scottish Borders Council

Proposed repower of Crystal Rig I wind farm with up to 10 new turbines, reaching up to around 230m blade-tip height.

Reference
SBO/25/01333/S36
Address
Crystal Rig Wind Farm Cranshaws Duns Scottish Borders
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Scottish Borders Council
Received
Validated
Last scraped
Record created
Latitude
55.915
Longitude
-2.5353

Plain-language summary

Proposed repower of Crystal Rig I wind farm with up to 10 new turbines, reaching up to around 230m blade-tip height.

As filed with the council

Construction and operation of a repower of Crystal Rig I wind farm. Consisting of up to 10 wind turbines including six turbines with a maximum overall height (to blade tip) of up to 230 m and the remaining four turbines with a maximum overall height (to blade tip) of up to 200 m.