Planning application · SBO/25/01781/S36
Up to 13 turbines proposed for Mid Hill Wind Farm.
Mid Hill Wind Farm North Of Harwood Farmhouse Hawick Scottish Borders
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Section 36 Consent
- Substation
- Temporary Crane Pads
- Wind Turbine
Overview
Why it’s worth watching
Major renewable energy development with significant scale and public infrastructure implications.
- Proposed
- A wind farm with turbines, energy storage and associated infrastructure
- Stage
- Past its target date of 2 Feb 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a wind farm north of Harwood Farmhouse near Hawick. It would include up to 13 turbines with a tip height of up to 200m, an energy storage system and related infrastructure.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/25/01781/S36?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/25/01781/S36. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Scottish Borders Council planning portal.
On the street
What neighbours would notice.
- 01
Turbines with a tip height of up to 200m are proposed.
- 02
An energy storage system is proposed.
- 03
The proposal includes a substation and control building.
- 04
Foundations and crane hardstandings are included.
Tags
- Associated Infrastructure
- Section 36 Consent
- Substation
- Temporary Crane Pads
- Wind Turbine
- Wind Turbine Count 13 Or Up To 13
What each tag is based on
- Associated Infrastructure
- “associated ancillary infrastructure”, “foundations, crane hardstandings”
- Section 36 Consent
- “S36 in reference”
- Substation
- “substation”
- Temporary Crane Pads
- “crane hardstandings”
- Wind Turbine
- “Proposed wind farm”, “up to 13 turbines”
- Wind Turbine Count 13 Or Up To 13
- “up to 13 turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Received2 Dec 2025
- Validated2 Dec 2025The council has everything it needs.
- Comments closed23 Dec 2025Usual deadline. Late comments may still count.
- Target decision (next)2 Feb 20262-month target for local developments.
- DecisionNot yet
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- SBO/25/01781/S36
- Address
- Mid Hill Wind Farm North Of Harwood Farmhouse Hawick Scottish Borders
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.