Planning application · SBO/25/01895/FUL
Solar panels proposed for Connections in Selkirk.
Connections 35 Back Row Selkirk Scottish Borders TD7 4LP
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
Preview similar trade leads
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Roof Works
- Roof Mounted Solar Panels
Overview
- Today
- A place of worship and community events; the roof has slates.
- Proposed
- 42 solar panels on the south-facing roof, with surrounding slates replaced.
- Size
- 42 panels solar panels · 3,500 m² site area
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes installing 42 solar photovoltaic panels on the south-facing roof at Connections, a building used for worship and community events. The surrounding roof slates would also be replaced.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/25/01895/FUL?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/25/01895/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Scottish Borders Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Solar panels are proposed on the south-facing roof.
- 02
The surrounding roof slates would be replaced.
Questions
What is the building used for now?
The form says it is used as a place of worship and for community events.
Has a decision been made?
The record says the application is decided, but does not give the decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Roof Works
- Roof Mounted Solar Panels
What each tag is based on
- Roof Works
- “replace surrounding slates”
- Roof Mounted Solar Panels
- “south facing roof”, “solar photo voltaic array”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received18 Dec 2025
- Validated18 Dec 2025The council has everything it needs.
- Comments closed8 Jan 2026Usual deadline. Late comments may still count.
- Target decision18 Feb 20262-month target for local developments.
- DecisionDecided
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- SBO/25/01895/FUL
- Address
- Connections 35 Back Row Selkirk Scottish Borders TD7 4LP
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Selkirkshire
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.