Planning application · SBO/26/01021/NECON
Eight turbines, solar array and battery storage proposed at Auchinoon Energy Park.
Auchinoon Energy Park Livningston West Lothian
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Renewable Energy Infrastructure
- Wind Turbine Count 13 Or Up To 13
- Wind Turbine Count 5
- Wind Turbine Count 8
Overview
Why it’s worth watching
Large-scale energy infrastructure with significant landscape and community impact.
- Proposed
- Eight turbines, a solar photovoltaic array and a battery energy storage system
- Size
- 8 turbines
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes eight turbines, each 200 metres from base to tip, along with a solar photovoltaic array and a battery energy storage system. The record does not describe the site’s current use.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/26/01021/NECON?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/26/01021/NECON. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Scottish Borders Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
Eight turbines, each 200 metres from base to tip, are proposed.
- 02
A solar photovoltaic array is proposed.
- 03
A battery energy storage system is proposed.
Tags
- Renewable Energy Infrastructure
- Wind Turbine Count 13 Or Up To 13
- Wind Turbine Count 5
- Wind Turbine Count 8
What each tag is based on
- Renewable Energy Infrastructure
- “description: "solar photovoltaic array and battery energy storage system (BESS)"”
- Wind Turbine Count 13 Or Up To 13
- “ai_summary: "Erection of 8 wind turbines up to 200m"”
- Wind Turbine Count 5
- “ai_summary: "Erection of 8 wind turbines up to 200m"”
- Wind Turbine Count 8
- “Erection of 8 turbines, 200 metre base to tip”
Where it’s at
The council has decided.
- Received7 Jul 2026
- Validated7 Jul 2026The council has everything it needs.
- Comments closed28 Jul 2026Usual deadline. Late comments may still count.
- Target decision7 Sept 20262-month target for local developments.
- DecisionDecided
The record
- Reference
- SBO/26/01021/NECON
- Address
- Auchinoon Energy Park Livningston West Lothian
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.