Planning application · SBO/26/01196/FUL
16-panel solar array proposed south of the A708.
Land South Of Greenwells Yarrow Selkirk Scottish Borders
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Ground Mounted Solar Panels
Overview
Why it’s worth watching
Ground-based solar array is a meaningful renewable energy installation with likely landscape and community implications.
- Today
- An unused field with rough grass, bracken and other low vegetation.
- Proposed
- A ground-mounted row of 16 solar panels, connected by an under-road cable to the electricity supply at Greenwells.
- Size
- 16 solar panels · 45 m² site area
- Stage
- Decided: Decided.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes a ground-mounted array of 16 solar panels in a field immediately south of the A708, across the road from Greenwells. The panels would face south, away from the road, and an underground cable beneath the road would connect them to the electricity supply at the residential property. The proposal follows pre-application advice under reference 26/00017/PREAPP; the earlier layout and a proposed wooden building were removed or changed.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/26/01196/FUL?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/26/01196/FUL. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Scottish Borders Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The panels would be in the field south of the A708, across the road from Greenwells, and would face away from the road.
- 02
An underground cable would pass beneath the road to connect the panels to the electricity supply at Greenwells.
Questions
Was there an earlier proposal?
Yes. The application form refers to pre-application advice under 26/00017/PREAPP. Following feedback, the panel layout was reduced and the proposed wooden building was removed.
Has a decision been made?
The record says the application is decided but does not give the decision.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Ground Mounted Solar Panels
What each tag is based on
- Ground Mounted Solar Panels
- “ground based solar photo voltaic array”
As lodged
The drawings.




All documents (4)
- Photographs with annotated location plan showing position and direction from whi
- Satellite images and ground elevation sections of the proposed site of the solar
- Photographs with annotated location plan showing position and direction from whi
- Satellite images and ground elevation sections of the proposed site of the solar
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided.
- Received11 Aug 2026
- Validated12 Aug 2026The council has everything it needs.
- Comments closed2 Sept 2026Usual deadline. Late comments may still count.
- Target decision12 Oct 20262-month target for local developments.
- DecisionDecided
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
- Pre-application advice
- Informal feedback from council planners before an application is lodged. It doesn't bind the final decision.
The record
- Reference
- SBO/26/01196/FUL
- Address
- Land South Of Greenwells Yarrow Selkirk Scottish Borders
- Status
- Decided
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.



