Planning application · SBO/26/01573/FUL
Embankment works and slipway extension proposed at Eyemouth.
Slipway North Of Boatbuilding Yard Brown's Bank Eyemouth Scottish Borders
£1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Small 4/10
- Marine Infrastructure
- Retrospective
- Riverbank Reinforcement
Overview
- Today
- A slipway serving a boatyard and an adjacent embankment.
- Proposed
- Embankment works and an extension to the concrete slipway.
- Size
- 220 m² site area
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks permission for embankment works on health and safety grounds and an extension to the concrete slipway at Eyemouth Marine. Work had started before the application: loose material was removed because it was considered at risk of collapsing onto working areas. The application describes the works as part retrospective, meaning some work has already taken place.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/26/01573/FUL?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/26/01573/FUL. City Scope can email you when this application is decided. To comment on the application, use the Scottish Borders Council planning portal.
Get an email when this application is decidedOn the street
What neighbours would notice.
- 01
Embankment works are proposed on health and safety grounds.
- 02
The concrete slipway would be extended.
Questions
Has work already taken place?
Yes. The form says work had started, including removal of loose material from the embankment.
Why was work carried out before applying?
The form says the loose material was considered at risk of collapsing onto working areas.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Marine Infrastructure
- Retrospective
- Riverbank Reinforcement
What each tag is based on
- Marine Infrastructure
- “extension to concrete slipway”
- Retrospective
- “(part retrospective)”
- Riverbank Reinforcement
- “Embankment works”
All documents (3)
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments are open until 27 November.
- Received19 Oct 2026
- Validated6 Nov 2026The council has everything it needs.
- Comments close (next)27 Nov 2026Usual deadline, 21 days after validation.
- Target decision6 Jan 20272-month target for local developments.
- DecisionNot yet
Planning terms
- Full planning permission
- Permission for the actual building work or change of use, as drawn. The standard type of planning application.
The record
- Reference
- SBO/26/01573/FUL
- Address
- Slipway North Of Boatbuilding Yard Brown's Bank Eyemouth Scottish Borders
- Status
- Registered
- Category
- New-Build & Major Development
- Impact scale
- 4/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.






