Repowering plans for Bowbeat Windfarm include up to 9 turbines.
Bowbeat Windfarm Innerleithen Scottish Borders
£1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Large 8/10
- Renewable Energy Infrastructure
- Section 36 Consent
- Wind Turbine
Overview
Why it’s worth watching
Repowering a wind farm with up to nine 230m turbines exceeding 50MW plus battery storage is a major energy infrastructure change with landscape and ornithological considerations.
- Today
- The record refers to Bowbeat Windfarm but does not describe its existing turbines or infrastructure.
- Proposed
- A repowered wind farm with up to 9 turbines, battery energy storage and supporting infrastructure.
- Size
- 230 m maximum blade tip height
- Stage
- Comments closed. Decision due by 27 Dec 2026.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application concerns construction and operation of a repowered Bowbeat Wind Farm. It describes up to 9 turbines, with a maximum blade tip height of 230m and combined capacity exceeding 50MW. Battery energy storage and other supporting infrastructure are also included.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/26/01621/SCO?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/26/01621/SCO. City Scope can email you when this application is decided. To comment on the application, use the Scottish Borders Council planning portal.
Get an email when this application is decidedOn the street
What neighbours would notice.
- 01
Wind turbines with a maximum blade tip height of 230m are proposed.
- 02
Battery energy storage and supporting infrastructure are included; the description does not say where they would be located.
Tags
- Renewable Energy Infrastructure
- Section 36 Consent
- Wind Turbine
What each tag is based on
- Renewable Energy Infrastructure
- “repowered Bowbeat Wind Farm”
- Section 36 Consent
- “combined capacity exceeding 50MW”
- Wind Turbine
- “repowered Bowbeat Wind Farm comprising up to 9 turbines”
As lodged
The drawings.
All documents (3)
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 27 December.
- Received27 Oct 2026
- Validated27 Oct 2026The council has everything it needs.
- Comments closed17 Nov 2026Usual deadline. Late comments may still count.
- Target decision (next)27 Dec 20262-month target for local developments.
- DecisionNot yet
Linked application
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- SBO/26/01621/SCO
- Address
- Bowbeat Windfarm Innerleithen Scottish Borders
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.