Planning application · SBO/26/01741/SCO
Up to 10 turbines, up to 220m tall, proposed near Oxton.
Repowered Dun Law Phase 1 Wind Farm Oxton Scottish Borders
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Major 9/10
- Associated Infrastructure
- Eia Scoping
- Renewable Energy Infrastructure
- Wind Turbine
Overview
Why it’s worth watching
A large-scale wind farm repowering with turbines up to 220m and battery storage is a material energy infrastructure proposal.
- Proposed
- A wind farm with up to 10 turbines, battery energy storage and supporting infrastructure
- Size
- 220 m maximum blade tip height
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes a wind farm with up to 10 turbines and a maximum blade tip height of 220m. It would include battery energy storage and supporting infrastructure, with combined capacity exceeding 50MW.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
1,291 of 1,291 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Scottish Borders Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SBO/26/01741/SCO?
Follow it on City Scope. This page is checked against the Scottish Borders Council planning register and shows the latest status, decision and documents for SBO/26/01741/SCO. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Scottish Borders Council planning portal.
On the street
What neighbours would notice.
- 01
Wind turbines would be built, with a maximum blade tip height of 220m.
- 02
Battery energy storage and supporting infrastructure are included in the proposal.
Tags
- Associated Infrastructure
- Eia Scoping
- Renewable Energy Infrastructure
- Wind Turbine
What each tag is based on
- Associated Infrastructure
- “ancillary infrastructure”
- Eia Scoping
- “26/01741/SCO”
- Renewable Energy Infrastructure
- “Wind Farm”, “battery energy storage”
- Wind Turbine
- “Wind Farm comprising up to 10 turbines”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments are open until 9 December.
- Received18 Nov 2026
- Validated18 Nov 2026The council has everything it needs.
- Comments close (next)9 Dec 2026Usual deadline, 21 days after validation.
- Target decision18 Jan 20272-month target for local developments.
- DecisionNot yet
Planning terms
- Ancillary
- Part of the main use rather than a separate business. An ancillary hotel bar serves the hotel.
The record
- Reference
- SBO/26/01741/SCO
- Address
- Repowered Dun Law Phase 1 Wind Farm Oxton Scottish Borders
- Status
- Registered
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 9/10
- Authority
- Scottish Borders Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







