Planning applicationSHE/2025/019/MAR

Railsbrough Catfirth

DecidedOutbuildings & Ancillary Structures
Official records · analysis in progress

380 of 380 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.

Proposals and decisions come from Shetland Islands Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

6 November 2025

Validated

14 November 2025

Planning Signals

3 detected traits

Specific
Fish Farming Mooring PenMarine InfrastructureTemporary Development
Application Insights

No form insights available yet.

AI summary

Temporary storage of several salmon-farm pen sections within the existing deployed grid mooring system for up to 12 months (not for production).

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SHE/2025/019/MAR

Railsbrough Catfirth

DecidedOutbuildings & Ancillary StructuresReceived Shetland Islands Council

Temporary storage of several salmon-farm pen sections within the existing deployed grid mooring system for up to 12 months (not for production).

Reference
SHE/2025/019/MAR
Address
Railsbrough Catfirth
Status
Decided
Category
Outbuildings & Ancillary Structures
Impact scale
3/10
Authority
Shetland Islands Council
Received
Validated
Last scraped
Record created
Latitude
60.2437
Longitude
-1.1856

Plain-language summary

Temporary storage of several salmon-farm pen sections within the existing deployed grid mooring system for up to 12 months (not for production).

As filed with the council

To temporarily store 4 x 160m-circumference pens and 1 x 120m-circumference pen (not to be used for production) within the current deployed grid mooring system at an existing consented salmon farm, for a maximum period of 12 months