Planning application · SHE/2025/020/MAR
Retrospective proposal to temporarily store 5 pens within the existing grid mooring system at a consented salmon farm for up to 12 months.
Laxfirth Tingwall
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Outbuildings & Ancillary Structures
- Small 3/10
- Aquaculture Hatchery
- Fish Farming Mooring Pen
- Marine Infrastructure
- Retrospective
- Temporary Development
Overview
Why it’s worth watching
Retrospective storage of large aquaculture equipment is substantial and may raise concerns.
- Stage
- Decided on 8 Jan 2026: Grant subject to conditions.
The council writes only to properties within 20 metres of an application site. Who is told
As lodged with the council
To temporarily store 5 x 160m-circumference pens (not to be used for production) within the current deployed grid mooring system at an existing consented salmon farm, for a maximum period of 12 months (retrospective)
The headline is a plain-English summary written with AI from the council record.
Keep reading
Official records · analysis in progress
380 of 380 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Shetland Islands Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SHE/2025/020/MAR?
Follow it on City Scope. This page is checked against the Shetland Islands Council planning register and shows the latest status, decision and documents for SHE/2025/020/MAR. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Shetland Islands Council planning portal.
Set up a planning alertThe impact
What the application says.
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Aquaculture Hatchery
- Fish Farming Mooring Pen
- Marine Infrastructure
- Retrospective
- Temporary Development
What each tag is based on
- Aquaculture Hatchery
- “consented salmon farm”
- Fish Farming Mooring Pen
- “within the current deployed grid mooring system”, “5 x 160m-circumference pens”
- Marine Infrastructure
- “salmon farm”
- Retrospective
- “(retrospective)”
- Temporary Development
- “for a maximum period of 12 months”
All documents (3)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 8 January 2026.
- Received6 Nov 2025
- Validated14 Nov 2025The council has everything it needs.
- Comments closed5 Dec 2025Usual deadline. Late comments may still count.
- Target decision14 Jan 20262-month target for local developments.
- Decision8 Jan 2026Grant subject to conditions.
The record
- Reference
- SHE/2025/020/MAR
- Address
- Laxfirth Tingwall
- Status
- Decided
- Council decision
- Grant subject to conditions
- Decision issued
- Category
- Outbuildings & Ancillary Structures
- Impact scale
- 3/10
- Authority
- Shetland Islands Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.






