Skip to content

Planning application · SHE/2025/308/PPF

SHE/2025/308/PPFDecidedWorth watching

25 temporary accommodation cabins proposed on Fair Isle.

Land West Of The Puffin Building Fair Isle Shetland

Shetland Islands Council

Preview alerts near this site

Free preview. £1 a month for one alert. Cancel any time.

Preview alerts near your postcode
Category
New-Build & Major Development
Scale
Medium 6/10
Tags
  • Battery Storage
  • Generator
  • Septic Tank
  • Temporary Site Accommodation

Overview

Why it’s worth watching

Installing 25 temporary accommodation cabins with new septic and power infrastructure is a material local change for a small island community.

Today
Open land beside the existing Puffin Building.
Proposed
A temporary accommodation site with 25 cabins. The existing Puffin Building would be used as a canteen, with minor internal upgrade works.
Size
25 temporary cabins · 2,000 m² site area
Stage
Decided on 11 Mar 2026: Grant subject to conditions.

The council writes only to properties within 20 metres of an application site. Who is told

Elevation of cabins layout

In plain English

The application was for a temporary accommodation site on open land beside the existing Puffin Building, to house workers carrying out the Fair Isle ferry terminal upgrade. It includes a new septic tank system and a temporary electricity supply with generators, a battery pack and a slave tank. The application says the permission is needed for one year, from Feb 2026 to Feb 2027. The council granted permission subject to conditions.

Written with AI from the application form and the council record.

Keep reading

Official records · analysis in progress

380 of 380 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.

Proposals and decisions come from Shetland Islands Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

Track this application

How do I track planning application SHE/2025/308/PPF?

Follow it on City Scope. This page is checked against the Shetland Islands Council planning register and shows the latest status, decision and documents for SHE/2025/308/PPF. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the Shetland Islands Council planning portal.

Set up a planning alert