Planning application · SHE/2026/218/PPF
Underground cable connection proposed at Luggie's Knowe.
Luggie's Knowe Hill Of Gremista. Reference: HU 46191 45162
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 3/10
- Electrical Infrastructure
- Underground Cable Route Works
- Utility Connection
Overview
- Today
- Rural uplands / upland agricultural grazing
- Proposed
- Underground cable connection to the local distribution network
- Size
- 49.70 ha site area
- Stage
- Comments closed. Decision due by 22 Feb 2027.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application proposes an underground cable connection from Luggie's Knowe Wind Farm Phase 2 to a point of connection on the local distribution network. The site is described as rural uplands used for upland agricultural grazing. The application is pending consideration.
Written with AI from the application form and the council record.
Keep reading
Official records · analysis in progress
380 of 380 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026.
Proposals and decisions come from Shetland Islands Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SHE/2026/218/PPF?
Follow it on City Scope. This page is checked against the Shetland Islands Council planning register and shows the latest status, decision and documents for SHE/2026/218/PPF. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the Shetland Islands Council planning portal.
On the street
What neighbours would notice.
- 01
An underground cable connection is proposed between Luggie's Knowe Wind Farm Phase 2 and the local distribution network.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Electrical Infrastructure
- Underground Cable Route Works
- Utility Connection
What each tag is based on
- Electrical Infrastructure
- “underground cable connection”, “local distribution network point of connection”
- Underground Cable Route Works
- “Installation of underground cable connection”
- Utility Connection
- “local distribution network point of connection”
As lodged
The drawings.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments have closed. A decision is due by 22 February.
- Received22 Oct 2026
- Validated22 Oct 2026The council has everything it needs.
- Comments closed12 Nov 2026Usual deadline. Late comments may still count.
- Target decision (next)22 Feb 20274-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- SHE/2026/218/PPF
- Address
- Luggie's Knowe Hill Of Gremista. Reference: HU 46191 45162
- Status
- Pending Consideration
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 3/10
- Authority
- Shetland Islands Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.