Planning application · SLK/P/25/1158
131 roof-mounted solar panels proposed at Bonnington Power Station.
Bonnington Power Station Bonnington Lanark ML11 9TB
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Listed Building
- Hydroelectric Power Station
- Roof Mounted Solar Panels
- Solar Cabling Fixings
Overview
- Today
- Operational hydro electric power station
- Proposed
- Operational hydro electric power station with 131 roof-mounted solar panels and associated infrastructure
- Size
- 131 solar panels
- Listed
- Category A
- Stage
- Decided on 3 Dec 2025: Application approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application sought listed building consent for 131 solar panels on the roof and associated infrastructure at Bonnington Power Station. The building is Category A listed, and the works include exterior alterations. The council approved the application on 3 December 2025. The form also names a linked application, reference 100719373, for 90 roof-mounted solar panels; it was listed as active.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/25/1158?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/25/1158. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
131 solar panels would be installed on the power station roof, with associated infrastructure.
Questions
Has the application been decided?
Yes. The application was approved on 3 December 2025.
Is there a linked application?
Yes. The form names reference 100719373 for 90 roof-mounted solar panels and lists it as active.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Listed Building
- Hydroelectric Power Station
- Roof Mounted Solar Panels
- Solar Cabling Fixings
What each tag is based on
- Listed Building
- “(Listed Building Consent)”
- Hydroelectric Power Station
- “Bonnington Power Station”
- Roof Mounted Solar Panels
- “roof mounted solar panels”
- Solar Cabling Fixings
- “associated cabling and mounting infrastructure”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 3 December 2025.
- Received30 Sept 2025
- Validated30 Sept 2025The council has everything it needs.
- Comments closed21 Oct 2025Usual deadline. Late comments may still count.
- Target decision30 Nov 20252-month target for local developments.
- Decision3 Dec 2025Application approved.
Planning terms
- Category A listed
- Buildings of national or international importance.
The record
- Reference
- SLK/P/25/1158
- Address
- Bonnington Power Station Bonnington Lanark ML11 9TB
- Status
- Decided
- Council decision
- Application approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Clydesdale North
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







