Planning application · SLK/P/26/0788
50kW rooftop solar array and battery approved for sports complex.
Alistair Mccoist Complex Quarry Road East Kilbride G75 9LW
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Battery Storage At Listed Building
- Mechanical Plant
- Renewable Energy Infrastructure
- Roof Mounted Solar Panels
- Solar Panels Omitted
Overview
- Today
- A multi-functional sports complex with 80 vehicle parking spaces.
- Proposed
- A 50kW roof-mounted solar array and a 50kW battery storage unit. The form lists 80 vehicle parking spaces as proposed.
- Size
- 50 kW solar array · 50 kW battery storage · 2,450.50 m² site area
- Stage
- Decided on 18 Sept 2026: Application approved.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application was for a 50kW solar array on the roof of the Alistair McCoist Complex, with a 50kW battery storage unit to store excess power. South Lanarkshire Council approved the application.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0788?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0788. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
A solar array would be installed on the complex roof.
- 02
A battery storage unit and associated infrastructure are proposed; the case does not say where the battery unit would be located.
Questions
Has the council made a decision?
Yes. The application is recorded as approved.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Battery Storage At Listed Building
- Mechanical Plant
- Renewable Energy Infrastructure
- Roof Mounted Solar Panels
- Solar Panels Omitted
What each tag is based on
- Battery Storage At Listed Building
- “"associated infrastructure"”, “"50kW battery storage system"”
- Mechanical Plant
- “description: "...with associated infrastructure"”
- Renewable Energy Infrastructure
- “description: "Installation of 50kW roof mounted solar array and 50kW battery storage system"”
- Roof Mounted Solar Panels
- “ai_summary: "50kW roof solar array"”
- Solar Panels Omitted
- “"Installation of 50kW roof mounted solar array"”, “"50kW roof mounted solar array"”
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 18 September 2026.
- Received24 Jun 2026
- Validated27 Jul 2026The council has everything it needs.
- Comments closed17 Aug 2026Usual deadline. Late comments may still count.
- Target decision27 Sept 20262-month target for local developments.
- Decision18 Sept 2026Application approved.
The record
- Reference
- SLK/P/26/0788
- Address
- Alistair Mccoist Complex Quarry Road East Kilbride G75 9LW
- Status
- Decided
- Council decision
- Application approved
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- East Kilbride South
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.