Application SLK/P/26/0912
Redshaw To Hagshaw Tee To Bankend Rig III Substation
Proposed 132kV overhead line (around 36km) with UGC connection linking Redshaws to Bankend Rigg III, via Hagshaw Hill repowering phase 3.
The record
- Reference
- SLK/P/26/0912
- Address
- Redshaw To Hagshaw Tee To Bankend Rig III Substation
- Status
- Registered
- Category
- New-Build & Major Development
- Impact scale
- 8/10
- Authority
- South Lanarkshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
What is proposed
Plain-language summary
Proposed 132kV overhead line (around 36km) with UGC connection linking Redshaws to Bankend Rigg III, via Hagshaw Hill repowering phase 3.
As filed with the council
Erection of 132kV OHL approximately 36km in length and 1.72km of UGC running from Redshaws Substation to Bankend Rigg III Substation via the provision of a connection to Hagshaw Hill Repowering Phase 3 Substation.