Planning application · SLK/P/26/0912
A 36km overhead line and underground cable proposed between substations.
Redshaw To Hagshaw Tee To Bankend Rig III Substation
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- New-Build & Major Development
- Large 8/10
- Associated Infrastructure
- Overhead Utility Lines
- Rail Infrastructure
Overview
Why it’s worth watching
Major strategic grid infrastructure linking substations across roughly 36km of overhead line with clear public and landscape consequences.
- Proposed
- A 132kV overhead line and underground cable linking the named substations.
- Size
- 1.72 km underground cable · 132 kV voltage
- Stage
- Council responded on 28 Aug 2026: Scoping opinion adopted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application describes an approximately 36km 132kV overhead line and 1.72km of underground cable, running from Redshaws Substation to Bankend Rigg III Substation via a connection to Hagshaw Hill Repowering Phase 3 Substation. The council adopted a scoping opinion; the record does not give a planning permission decision.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0912?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0912. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
An overhead line is proposed between the named substations.
- 02
Underground cable is proposed as part of the connection.
Questions
What does the application propose?
A 132kV overhead line and underground cable from Redshaws Substation to Bankend Rigg III Substation, via a connection to Hagshaw Hill Repowering Phase 3 Substation.
Has planning permission been granted?
The record says the council adopted a scoping opinion. It does not give a planning permission decision.
Tags
- Associated Infrastructure
- Overhead Utility Lines
- Rail Infrastructure
What each tag is based on
- Associated Infrastructure
- ““via the provision of a connection to Hagshaw Hill Repowering Phase 3 Substation.””
- Overhead Utility Lines
- ““Erection of 132kV OHL approximately 36km in length””, ““1.72km of UGC running from Redshaws Substation to Bankend Rigg III Substation””
- Rail Infrastructure
- ““Erection of 132kV OHL approximately 36km in length””
Where it’s at
The council has responded on 28 August 2026.
- Received14 Jul 2026
- Validated22 Jul 2026The council has everything it needs.
- Comments closed12 Aug 2026Usual deadline. Late comments may still count.
- Target decision22 Sept 20262-month target for local developments.
- Decision28 Aug 2026Scoping opinion adopted.
The record
- Reference
- SLK/P/26/0912
- Address
- Redshaw To Hagshaw Tee To Bankend Rig III Substation
- Status
- Decided
- Council decision
- Scoping opinion adopted
- Decision issued
- Category
- New-Build & Major Development
- Impact scale
- 8/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
