Planning application · SLK/P/26/0942
Replacement 81m wind turbine proposed at Hawksland Farm.
Hawksland Farm C11 From Brocketsbrae To C10 At Wellshields Lesmahagow ML11 9PY
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Renewable Energy, EV & Heat Pumps
- Small 4/10
- Eia Screening
- Wind Turbine
Overview
Why it’s worth watching
Replacing an existing turbine with an 81m blade-tip machine is a material renewable energy change in a rural Clydesdale location, documented by elevation, location and visibility drawings.
- Today
- An existing wind turbine.
- Proposed
- A replacement wind turbine measuring 81m to the blade tip.
- Size
- 81 m height to blade tip
- Stage
- Council responded on 1 Sept 2026: Screening opinion - EIA not required.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application seeks a screening opinion on replacing an existing wind turbine with a turbine measuring 81m to the blade tip. A screening opinion decides whether an Environmental Impact Assessment is required. The council decided that an Environmental Impact Assessment is not required.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/0942?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/0942. City Scope can also email you when a new application is lodged nearby. To comment on the application, use the South Lanarkshire Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The existing wind turbine would be replaced by a wind turbine measuring 81m to the blade tip.
Tags
- Eia Screening
- Wind Turbine
What each tag is based on
- Eia Screening
- “Request for Screening Opinion”
- Wind Turbine
- “erecting a replacement 81m to blade tip wind turbine”
As lodged
The drawings.
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has responded on 1 September 2026.
- Received24 Jul 2026
- Validated24 Jul 2026The council has everything it needs.
- Comments closed14 Aug 2026Usual deadline. Late comments may still count.
- Target decision24 Sept 20262-month target for local developments.
- Decision1 Sept 2026Screening opinion - EIA not required.
The record
- Reference
- SLK/P/26/0942
- Address
- Hawksland Farm C11 From Brocketsbrae To C10 At Wellshields Lesmahagow ML11 9PY
- Status
- Decided
- Council decision
- Screening opinion - EIA not required
- Decision issued
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 4/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
- Ward
- Clydesdale South
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.







