CityScope · Planning Updates
Application SLK/P/26/1269
Land At Low Drumclog Wind Farm Extension Drumclog Strathaven
EIA screening request for a single wind turbine with blade tip height up to 180m, a BESS up to 16MW and associated infrastructure.
The record
- Reference
- SLK/P/26/1269
- Address
- Land At Low Drumclog Wind Farm Extension Drumclog Strathaven
- Status
- Awaiting decision
- Category
- Renewable Energy, EV & Heat Pumps
- Impact scale
- 8/10
- Authority
- South Lanarkshire Council
Timeline
- Received
- Validated
- Last scraped
- Record created
Additional application data
- Latitude
- 55.675627
- Longitude
- -4.064323000000001
What is proposed
Plain-language summary
EIA screening request for a single wind turbine with blade tip height up to 180m, a BESS up to 16MW and associated infrastructure.
As filed with the council
EIA Screening Request - erection of single wind turbine with a blade tip height up to 180m and erection of BESS with capacity up to 16MW and associated infrastructure.
