Planning application · SLK/P/26/1344
Application to extend the deadline for three wind turbines at Bankend Rig.
Bankend Rig Windfarm Waterhead Peelhill and Linbank Highway Strathaven
Free with a City Scope account. One email, when the council decides.
Also email me new applications nearby · £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Legal / Administrative
- Minor 1/10
- Planning Permission Time Extension
- Section 42 Variation
- Wind Turbine
Overview
- Today
- The site’s current or most recent use is commercial forestry.
- Proposed
- Change the implementation date of the existing permission for three wind turbines and associated works.
- Size
- 3 turbines in existing permission · 250 m maximum turbine height to tip · 30 years permission period sought
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
This Section 42 application seeks to change the implementation date of the existing permission P/21/1385. That permission is for three wind turbines, up to 250m to the tip, with access tracks, crane hardstandings, a temporary construction compound and a borrow pit. The application form says the permission is sought for 30 years. The form says work has not started.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.
Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application SLK/P/26/1344?
Follow it on City Scope. This page is checked against the South Lanarkshire Council planning register and shows the latest status, decision and documents for SLK/P/26/1344. City Scope can email you when this application is decided, free with a City Scope account. To comment on the application, use the South Lanarkshire Council planning portal.
On the street
What neighbours would notice.
- 01
The existing permission includes three wind turbines, up to 250m to the tip.
- 02
Associated works in the existing permission include access tracks, crane hardstandings, a temporary construction compound and a borrow pit.
Questions
What is this application changing?
It seeks to amend the implementation date of the existing permission, reference P/21/1385.
Have the works started?
No. The application form says work has not started or been completed.
From the application form
The application form
Every answer the applicant gave on the council’s form, searchable.
Tags
- Planning Permission Time Extension
- Section 42 Variation
- Wind Turbine
What each tag is based on
- Planning Permission Time Extension
- “amend the implementation date of planning permission”
- Section 42 Variation
- “Section 42 application to amend the implementation date”
- Wind Turbine
- “Bankend Rig Windfarm”
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
Comments are open until 26 November.
- Received20 Oct 2026
- Validated5 Nov 2026The council has everything it needs.
- Comments close (next)26 Nov 2026Usual deadline, 21 days after validation.
- Target decision5 Mar 20274-month target for major developments.
- DecisionNot yet
Planning terms
- Major development
- In Scotland, 50 or more homes, 10,000 m² or more of floor space, or a site over 2 hectares. These have a 4-month target and extra public consultation.
The record
- Reference
- SLK/P/26/1344
- Address
- Bankend Rig Windfarm Waterhead Peelhill And Linbank Highway Strathaven
- Status
- Registered
- Category
- Legal / Administrative
- Impact scale
- 1/10
- Authority
- South Lanarkshire Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.