Planning applicationSLK/P/26/1374

High Netherfauld House Farm Douglas Lanark ML11 0RL

RegisteredWorth watchingRenewable Energy & Sustainability
Official records · coverage in progress

1,134 of 1,211 official records received 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 77 records from that period are still being added or checked.

Proposals and decisions come from South Lanarkshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Location map
© MapTiler © OpenStreetMap contributors
Received

12 October 2026

Validated

30 October 2026

Planning Signals

2 detected traits

Specific
Associated InfrastructureSection 36 Consent
AI summary

Proposed battery energy storage system with associated infrastructure, generating capacity of up to 500MW.

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application SLK/P/26/1374

High Netherfauld House Farm Douglas Lanark ML11 0RL

RegisteredRenewable Energy, EV & Heat PumpsReceived South Lanarkshire Council

Proposed battery energy storage system with associated infrastructure, generating capacity of up to 500MW.

Reference
SLK/P/26/1374
Address
High Netherfauld House Farm Douglas Lanark ML11 0RL
Status
Registered
Category
Renewable Energy, EV & Heat Pumps
Impact scale
7/10
Authority
South Lanarkshire Council
Received
Validated
Last scraped
Record created
Latitude
55.588649
Longitude
-3.841249

Plain-language summary

Proposed battery energy storage system with associated infrastructure, generating capacity of up to 500MW.

As filed with the council

Installation of battery energy storage system and associated infrastructure with a generating capacity of up to 500MW - Consultation under Section 36 of the Electricity Act 1989