Planning application · SOUTHWARK/26/AP/0579
Details of condition 33 (access routes) for Buildings DE, F, OPQ, ST, U, V and W at Clements Road.
Tower Bridge Business Complex, 100, Clements Road
- Legal / Administrative
- Minor 1/10
Overview
- Stage
- Past its target date of 27 Apr 2026.
As lodged with the council
Details of condition 33 'Access Routes' for Buildings DE, F, OPQ, ST, U, V and W required by planning permission ref. 23/AP/2124 'Demolition, alterations and extension of existing buildings and erection of new buildings comprising a mixed-use scheme including providing new dwellings (Class C3), flexible Class A1/A3/A4/B1/D1/D2, flexible multi-use Class A1/A3/A4/D1 floorspace within retained Block BF-F, and a new secondary school. The development also includes communal amenity space, landscaping, children's playspace, car and cycle parking, installation of plant, new pedestrian, vehicular and servicing routes, the creation of two new pedestrian routes through the Railway Arches and associated works. Outline planning permission (with all matters reserved) for the part demolition and part retention of existing buildings and erection of two new buildings comprising a mixed-use scheme, providing new homes (Class C3) and flexible multi-use floorspace (Class A1/A3/A4/D1), and other associated works. Amendments to planning permission 17/AP/4088 and variation of its conditions including: Increase the total number of homes from 1536 to 1624, Increased provision of social rent homes, Changes to massing and architecture, Changes to the quantum and allocation of non-residential floorspace, Removal of block R and basement under block RST with its ramp, Revised provision of public realm, playspace and tree planting,Enhanced fire strategy for each building,Increased communal spaces for residents,Reconfigured parking provision,Revised energy and overheating strategy'.
The headline is a plain-English summary written with AI from the council record.
Keep reading
Track this application
How do I track planning application SOUTHWARK/26/AP/0579?
Follow it on City Scope. This page is checked against the Southwark planning register and shows the latest status, decision and documents for SOUTHWARK/26/AP/0579. To comment on the application, use the Southwark planning portal.
The impact
What it involves.
Drawings
Where the site is.
On the map
Open the planning map →© MapTiler © OpenStreetMap contributors
Where it’s at
Comments have closed. The target date for a decision has passed.
- Validated2 Mar 2026The council has everything it needs.
- Comments closed23 Mar 2026Usual deadline. Late comments may still count.
- Target decision (next)27 Apr 20268-week target for minor and other applications.
- DecisionNot yet
Planning terms
- Use class C3
- Dwellinghouses: homes lived in by one household or a small group.
- Public realm
- Streets, squares and paths open to everyone.
The record
- Reference
- SOUTHWARK/26/AP/0579
- Address
- Tower Bridge Business Complex, 100, Clements Road
- Status
- Application Under Consideration
- Category
- Legal / Administrative
- Impact scale
- 1/10
- Authority
- Southwark
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.
