Planning applicationSTG/25/00523/NPA

Footbridge Bridge Of Allan

UnknownWorth watchingOutbuildings & Ancillary Structures
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

25 September 2025

Validated

23 October 2025

Council decision
Prior Approval Granted
Decision issued

Planning Signals

3 detected traits

Specific
Bridge ContextBridge SafetyPedestrian Infrastructure
AI summary

Footbridge deck replacement with tension control bolts and new steel parapets/rails, replacing existing handrail elements.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/25/00523/NPA

Footbridge Bridge Of Allan

UnknownOutbuildings & Ancillary StructuresReceived Stirling Council

Footbridge deck replacement with tension control bolts and new steel parapets/rails, replacing existing handrail elements.

Reference
STG/25/00523/NPA
Address
Footbridge Bridge Of Allan
Status
Unknown
Council decision
Prior Approval Granted
Decision issued
Category
Outbuildings & Ancillary Structures
Impact scale
5/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.153149
Longitude
-3.942207999999999

Plain-language summary

Footbridge deck replacement with tension control bolts and new steel parapets/rails, replacing existing handrail elements.

As filed with the council

Replacement of deck, installation of Tension Control Bolts and installation of new parapets (comprising steel posts and rails)