Planning application · STG/25/00523/NPA
Footbridge deck and parapets to be replaced at Bridge of Allan.
Footbridge Bridge Of Allan
Free preview. £1 a month for one alert. Cancel any time.
Preview alerts near your postcode
- Outbuildings & Ancillary Structures
- Medium 5/10
- Bridge Context
- Bridge Safety
- Pedestrian Infrastructure
Overview
Why it’s worth watching
Replacement deck and parapets on a named public footbridge is a material change to local pedestrian infrastructure with clear public relevance.
- Proposed
- Replacement deck, Tension Control Bolts and new parapets
- Stage
- Decided on 17 Dec 2025: Prior Approval Granted.
The council writes only to properties within 20 metres of an application site. Who is told
In plain English
The application is for a replacement deck, Tension Control Bolts and new parapets made up of steel posts and rails. Prior approval is recorded as granted.
Written with AI from the application form and the council record.
Keep reading
Official records · coverage in progress
550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.
Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.
Check the council’s planning registerTrack this application
How do I track planning application STG/25/00523/NPA?
Follow it on City Scope. This page is checked against the Stirling Council planning register and shows the latest status, decision and documents for STG/25/00523/NPA. City Scope can also email you when a new application is lodged in this council area. To comment on the application, use the Stirling Council planning portal.
Set up a planning alertOn the street
What neighbours would notice.
- 01
The footbridge deck would be replaced.
- 02
New parapets made up of steel posts and rails would be installed.
Tags
- Bridge Context
- Bridge Safety
- Pedestrian Infrastructure
What each tag is based on
- Bridge Context
- “Footbridge Bridge Of Allan (address)”, “Footbridge deck replacement with tension control bolts and new steel parapets/rails (ai_summary)”
- Bridge Safety
- “installation of new parapets (comprising steel posts and rails)”, “new steel parapets/rails, replacing existing handrail elements (ai_summary)”
- Pedestrian Infrastructure
- “Footbridge Bridge Of Allan (address)”, “Footbridge deck replacement (ai_summary)”
All documents (4)
On the map
Open the planning map →© MapTiler / OpenFreeMap © OpenStreetMap contributors
Where it’s at
The council has decided on 17 December 2025.
- Received25 Sept 2025
- Validated23 Oct 2025The council has everything it needs.
- Comments closed13 Nov 2025Usual deadline. Late comments may still count.
- Target decision23 Dec 20252-month target for local developments.
- Decision17 Dec 2025Prior Approval Granted.
The record
- Reference
- STG/25/00523/NPA
- Address
- Footbridge Bridge Of Allan
- Status
- Unknown
- Council decision
- Prior Approval Granted
- Decision issued
- Category
- Outbuildings & Ancillary Structures
- Impact scale
- 5/10
- Authority
- Stirling Council
- Received
- Validated
- Last checked
- Added to City Scope
Discussion
Talk about this application.
Share what you know about the site with other City Scope readers.








