Planning applicationSTG/26/00047/FUL

Land 195M South West Of Manor Powis Roundabout Manor Powis Road Stirling

Awaiting decisionWorth watchingParking, Access & Highways
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 3
Received

29 January 2026

Validated

25 March 2026

Planning Signals

1 detected trait

Specific
Active Travel Route
Application Insights

No form insights available yet.

AI summary

New active travel (NCN) route along the A91, with a ramp down to field level and a link path to Grange Road.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/26/00047/FUL

Land 195M South West Of Manor Powis Roundabout Manor Powis Road Stirling

Awaiting decisionParking, Access & HighwaysReceived Stirling Council

New active travel (NCN) route along the A91, with a ramp down to field level and a link path to Grange Road.

Reference
STG/26/00047/FUL
Address
Land 195M South West Of Manor Powis Roundabout Manor Powis Road Stirling
Status
Awaiting decision
Category
Parking, Access & Highways
Impact scale
5/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1165227
Longitude
-3.9369029

Plain-language summary

New active travel (NCN) route along the A91, with a ramp down to field level and a link path to Grange Road.

As filed with the council

Proposed use of land including works to form active travel route (National Cycle Network), including active travel ramp from the A91 level to adjacent field level on land east of A91 and active travel path from the A91 to Grange Road