Planning applicationSTG/26/00222/LBC

Wallace Monument Hillfoots Road Manor Powis Stirling FK9 5LF

Awaiting decisionInternal Works & Accessibility
Official records · coverage in progress

550 of 736 official records validated 1 Sept 2025 – 31 Aug 2026 were available when checked on 6 Sept 2026. 186 records from that period are still being added or checked.

Proposals and decisions come from Stirling Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register
Planning document
1 / 4
Received

1 May 2026

Validated

1 May 2026

Planning Signals

8 detected traits

Works
Roof Works
Context
Listed Building
Specific
External AlterationsHeritage Masonry RepairsListed Building Consent ContextMemorial Monument
Application Insights

No form insights available yet.

AI summary

Repointing and structural repairs across the National Wallace Monuments tower masonry, spiral stair/perimeter walkway, roof upstands, Keepers Lodge, and 3rd-floor hall.

Impact scale

Estimated scale of impact on the surrounding area.

6/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application STG/26/00222/LBC

Wallace Monument Hillfoots Road Manor Powis Stirling FK9 5LF

Awaiting decisionInternal Works & AccessibilityReceived Stirling Council

Repointing and structural repairs across the National Wallace Monuments tower masonry, spiral stair/perimeter walkway, roof upstands, Keepers Lodge, and 3rd-floor hall.

Reference
STG/26/00222/LBC
Address
Wallace Monument Hillfoots Road Manor Powis Stirling FK9 5LF
Status
Awaiting decision
Category
Internal Works & Accessibility
Impact scale
6/10
Authority
Stirling Council
Received
Validated
Last scraped
Record created
Latitude
56.1388
Longitude
-3.9178

Plain-language summary

Repointing and structural repairs across the National Wallace Monuments tower masonry, spiral stair/perimeter walkway, roof upstands, Keepers Lodge, and 3rd-floor hall.

As filed with the council

Repointing and structural interventions to Perimeter Walkway, Spiral Stair and Tower elevation masonry; repoint masonry & form asphalt roof upstand to Mural Stair roofs; Keeper's Lodge repair of masonry to north facing roof, north gutter and adjacent walling and SW bartizan, repointing of masonry to west entrance and adjacent ground level plinth and repair (repointing and structural interventions) internally to 3rd floor Hall masonry