Planning applicationWDB/DC25/247/FUL

DFC Stadium Castle Road Dumbarton G82 1JJ

Application ReturnedWorth watchingLandscaping, Gardens & Boundaries
Historical records · current coverage unverified

216 stored records, received 25 June 2025 to 29 July 2026. Last collected 9 August 2026. The council register could not be reached on 6 September 2026, so current coverage and updates are unverified.

Proposals and decisions come from West Dunbartonshire Council. Additional summaries and analysis are being added where verified.

Check the council’s planning register

No documents shown on CityScope

Check the council portal for drawings and supporting documents.

Received

9 December 2025

Planning Signals

3 detected traits

Specific
Drainage Wastewater InfrastructureSports FacilitySynthetic Surface
AI summary

Replace the existing grass football pitch with modern astroturf on the same footprint, with new drainage to manage surface run-off.

Impact scale

Estimated scale of impact on the surrounding area.

5/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application WDB/DC25/247/FUL

DFC Stadium Castle Road Dumbarton G82 1JJ

Application ReturnedLandscaping, Gardens & BoundariesReceived West Dunbartonshire Council

Replace the existing grass football pitch with modern astroturf on the same footprint, with new drainage to manage surface run-off.

Reference
WDB/DC25/247/FUL
Address
DFC Stadium Castle Road Dumbarton G82 1JJ
Status
Application Returned
Category
Landscaping, Gardens & Boundaries
Impact scale
5/10
Authority
West Dunbartonshire Council
Received
Last scraped
Record created

Plain-language summary

Replace the existing grass football pitch with modern astroturf on the same footprint, with new drainage to manage surface run-off.

As filed with the council

The football club seeks to remove its existing grass pitch and replace with a modern astroturf pitch to the same plan dimensions and retained within the club's current pitch perimeter as demarcated by the palisade boundary fencing. Works would include drainage for collection and conveyance of surface run-off to the specification of the pitch manufacturer and supplier.