Skip to content

Planning application · WESTMINSTER/25/08914/FULL

WESTMINSTER/25/08914/FULLDecided

St Marys Hospital South Wharf Road London W2 1BL

Hyde Park ward · Westminster

Overview

GLA last reported: Approved (31 July 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

Type
Full planning permission
Stage
Decided: Decided.

As lodged with the council

Works to The Bays building comprising demolition of the existing roof, internal floors, internal walls and ground floor slab; retention of, and alteration to, the existing external walls and facade; and construction of new four-storey vertical extension, plus a roof level including a rooftop terrace, to provide a mixed-use building comprising: Exhibition, education and multifunctional space; Healthcare research laboratories and consulting rooms with associated clinical spaces; and/or Offices, workspace and meeting space. Demolition of existing portacabin, waste store, Vacuum Insulated Evaporator tank and compound; construction of a 2-storey ancillary pavilion structure; new public realm; new hard and soft landscaping; works to the canal wall; together with provision of servicing, refuse storage, cycle parking, plant equipment and all other associated works. Collectively to be known as the Fleming Centre (Sui Generis use).

Keep reading

Track this application

How do I track planning application WESTMINSTER/25/08914/FULL?

Follow it on City Scope. This page is checked against the Westminster planning register and shows the latest status, decision and documents for WESTMINSTER/25/08914/FULL. To comment on the application, use the Westminster planning portal.