Skip to content

Planning application · WESTMINSTER/26/03250/LBC

WESTMINSTER/26/03250/LBCDecided

Refurbishment of Galleries 30 and 31 in the Wilkins Building, with restoration, new ventilation, lighting and rooftop plant at The National Gallery Trafalgar Square.

The National Gallery Trafalgar Square London WC2N 5DN

St James's ward · Westminster

Category
Internal Works & Accessibility
Scale
Medium 6/10

Overview

GLA last reported: Approved (1 July 2026). The council's current status takes precedence; its result list has not verified these decision details. Source report captured .

Type
Listed building consent
Stage
Decided: Decided.

As lodged with the council

Refurbishment of Galleries 30 and 31 within the Wilkins Building, comprising internal restoration works including replacement and repair of floors, wall coverings and decorative plasterwork, installation of new ventilation, environmental controls and lighting, together with external alterations including rooftop plant and ductwork, modifications and extension of over-roof structures, replacement roof finishes and glazing, installation of solar shading fins and external wall insulation, new roof-level guarding, and formation of an external gantry for plant access.

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application WESTMINSTER/26/03250/LBC?

Follow it on City Scope. This page is checked against the Westminster planning register and shows the latest status, decision and documents for WESTMINSTER/26/03250/LBC. To comment on the application, use the Westminster planning portal.