Skip to content

Planning application · WESTMINSTER/26/06597/LBC

WESTMINSTER/26/06597/LBCPending

Refurbishment and repair of Room 9 including wall covering, timber flooring, marble skirtings, plaster ceiling, rooflight, louvres and M&E upgrades.

The National Gallery Trafalgar Square London WC2N 5DN

St James's ward · Westminster

Category
Internal Works & Accessibility
Scale
Small 4/10

Overview

Type
Listed building consent
Stage
Comments closed. Decision due by 20 Nov 2026.

As lodged with the council

Refurbishment and repair of Room 9 including replacement of the existing fabric wall covering; removal and replacement of the existing timber flooring; cleaning, repair and conservation of existing Verde di Prato marble skirtings and door surrounds; repair and redecoration of the decorative plaster ceiling and cornice, including revisions to the existing gilding scheme; refurbishment of the existing rooflight and associated roof repairs; temporary removal and reinstatement of external louvre assemblies; and associated mechanical and electrical upgrades including concealed cornice uplighting, replacement lighting equipment and replacement/additional power outlets.

The headline is a plain-English summary written with AI from the council record.

Keep reading

Track this application

How do I track planning application WESTMINSTER/26/06597/LBC?

Follow it on City Scope. This page is checked against the Westminster planning register and shows the latest status, decision and documents for WESTMINSTER/26/06597/LBC. To comment on the application, use the Westminster planning portal.