Planning applicationWLO/0646/EXC/25

Hagshaw Hill III Wind Farm Douglas South Lanarkshire

DecidedWorth watchingRenewable Energy & Sustainability
Planning document
Received

13 August 2025

Validated

13 August 2025

Planning Signals

4 detected traits

Specific
Associated InfrastructureEia ScopingRenewable Energy InfrastructureWind Turbine
AI summary

Up to 8 turbines, solar PV and battery storage are proposed at Hagshaw Hill III Wind Farm, with major associated infrastructure.

Impact scale

Estimated scale of impact on the surrounding area.

8/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application WLO/0646/EXC/25

Hagshaw Hill III Wind Farm Douglas South Lanarkshire

DecidedRenewable Energy, EV & Heat PumpsReceived Local authority

Up to 8 turbines, solar PV and battery storage are proposed at Hagshaw Hill III Wind Farm, with major associated infrastructure.

Reference
WLO/0646/EXC/25
Address
Hagshaw Hill III Wind Farm Douglas South Lanarkshire
Status
Decided
Category
Renewable Energy, EV & Heat Pumps
Impact scale
8/10
Authority
Local authority
Received
Validated
Last scraped
Record created

Plain-language summary

Up to 8 turbines, solar PV and battery storage are proposed at Hagshaw Hill III Wind Farm, with major associated infrastructure.

As filed with the council

Consultation from Scottish Government on EIA scoping opinion for up to 8 wind turbines with a maximum blade tip height of 200 metres, approximately 30 MW of solar photovoltaic (PV) energy generation, approximately 50 MW of long duration electricity storage (LDES), and associated infrastructure (total generating capacity approximately 138 MW)