Planning applicationEDI/23/01308/VAR3

Wester Hailes Education Centre 5 Murrayburn Drive Calders Edinburgh EH14 2SU

Permission has been variedMechanical Plant, Flues & Ventilation
Planning document
1 / 4
Received

11 March 2025

Validated

13 March 2025

Planning Signals

4 detected traits

Use
Education
Works
Roof Works
Specific
External AlterationsMechanical Plant
Application Insights

No form insights available yet.

AI summary

Minor tweaks to the approved teaching block: lowered parapet, sloped east/west edges, clerestory upstand removed, assembly hall louvre moved west, faade fin realigned for cleaner balance. .

Impact scale

Estimated scale of impact on the surrounding area.

3/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/23/01308/VAR3

Wester Hailes Education Centre 5 Murrayburn Drive Calders Edinburgh EH14 2SU

Permission has been variedMechanical Plant, Flues & VentilationReceived Local authority

Minor tweaks to the approved teaching block: lowered parapet, sloped east/west edges, clerestory upstand removed, assembly hall louvre moved west, faade fin realigned for cleaner balance. .

Reference
EDI/23/01308/VAR3
Address
Wester Hailes Education Centre 5 Murrayburn Drive Calders Edinburgh EH14 2SU
Status
Permission has been varied
Category
Mechanical Plant, Flues & Ventilation
Impact scale
3/10
Authority
Local authority
Received
Validated
Last scraped
Record created
Latitude
55.9175065
Longitude
-3.2902961

Plain-language summary

Minor tweaks to the approved teaching block: lowered parapet, sloped east/west edges, clerestory upstand removed, assembly hall louvre moved west, faade fin realigned for cleaner balance. .

As filed with the council

Non Material Variation to planning permission 23/01308/FUL - Key elevation changes include: Roof parapet adjustment: The roof upstand has been reduced to 1100mm above the finished roof level. It will have a flat top at the South and North walls, while the West and East walls will have a sloping design. The large mechanical units will remain hidden from view along the canal footpath (please refer to the cross-sections showing on dotted grey line). Clerestory upstand parapet removal: This change is not visible from outside the teaching block roof. -Assembly Hall ventilation louvre relocation: Moved from the North elevation to the West elevation. Vertical fin relocation (Level 1 - West elevation): Now aligned with the concrete column to balance the render and brick external wall finishes.