Planning applicationEDI/23/03649/VARY

525 Ferry Road Edinburgh EH5 2DW

Awaiting decisionWorth watchingNew-Build & Major Development
Planning document
1 / 5
Received

11 December 2025

Validated

12 December 2025

Planning Signals

2 detected traits

Works
Facade / Exterior
Specific
Roof Terrace Pavilion
Application Insights

No form insights available yet.

AI summary

Tweaks to multi-block housing: Block E now build-to-rent, one floor lower; layouts, balconies, facades, basement refined; PVs on roofs. .

Impact scale

Estimated scale of impact on the surrounding area.

7/10
DISCUSSION

No comments yet

Be the first to share your local perspective on this application.

CityScope · Planning Updates

Application EDI/23/03649/VARY

525 Ferry Road Edinburgh EH5 2DW

Awaiting decisionNew-Build & Major DevelopmentReceived The City of Edinburgh Council

Tweaks to multi-block housing: Block E now build-to-rent, one floor lower; layouts, balconies, facades, basement refined; PVs on roofs. .

Reference
EDI/23/03649/VARY
Address
525 Ferry Road Edinburgh EH5 2DW
Status
Awaiting decision
Category
New-Build & Major Development
Impact scale
7/10
Authority
The City of Edinburgh Council
Received
Validated
Last scraped
Record created
Latitude
55.9682
Longitude
-3.233

Plain-language summary

Tweaks to multi-block housing: Block E now build-to-rent, one floor lower; layouts, balconies, facades, basement refined; PVs on roofs. .

As filed with the council

A non-material variation is sought for the following- 1.Block E has changed from Private for Sale to Build To Rent. This results in a 1 storey reduction, a change to the accommodation mix and amendments to the elevations. 2.Internal apartment layouts have been developed to suit the affordable and BTR providers requirement as well as the private for sale market. 3.The central stair core from Block E has been removed. 4.Minor facade changes have been made to align with the internal layouts. 5.The basement structure has been rationalised to make it more efficient for construction and operation. 6.Blocks A-D - mid-floor banding has changed from a pressed metal banding to a pre-cast stringcourse. 7.Balcony sizes have been rationalised across all blocks as well as the metalwork detail. 8.PVs have been added to the Block E+F roof to meet Building Standards.